Description:

UK Business Procedure/Transmission Procedures - Protection and Control Relay Settings

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

PURPOSE AND SCOPE

The health of the National Grid Electricity Transmission System is critically dependent upon correct relay settings. It is therefore essential that this process is adhered to both rigorously and diligently.

The purpose of this procedure is to define the management process for the preparation, application, verification, dissemination, recording and auditing of protection and control relay settings. This procedure defines both the Client side (i.e. National Grid Electricity Transmission) tasks, responsibilities and levels of surveillance, and the Contractor side tasks and responsibilities.

The procedure applies to all protection and control relays owned by National Grid Electricity Transmission (NGET), or for which NGET has entered into an arrangement to carry out and hold the settings. The procedure is formatted on the basis that relay settings calculations will be carried out by UKBP/TP141 authorised Contractor engineers either as part of a capital scheme, or as part of ongoing support through a Post Delivery Support Agreement (PDSA) or Secondary System Support Contract (SSSC).

The scope of this procedure covers all protection and control equipment which require a setting, including associated equipment such as current transformers and facility selection functions. It covers the settings process associated with

• the capital programme

• maintenance & operations

• following equipment failure

• third party interfaces as required by the Grid Code

• setting changes requested by the Transmission Network Control Centre (TNCC).


Edition : 13
File Size : 1 file , 580 KB
Number of Pages : 58
Published : 01/01/2019

History

NG UKBP/TP 107
Published Date: 01/01/2019
UK Business Procedure/Transmission Procedures - Protection and Control Relay Settings
$138
NG UKBP/TP 107
Published Date: 05/01/2014
UK Business Procedure/Transmission Procedures - Protection and Control Relay Settings
$138

Related products

NG SCT 35.02
Published Date: 03/01/1998
Site Commissioning Tests - Cegelec T5000 Automatic Reactive Switching (ARS) System
$55.2
NG NSBP 198E
Published Date: 10/01/2006
Network Strategy Business Procedures - The Management of Incident Investigation and Audit Report Recommendations
$55.2
NG SCT 50
Published Date: 12/01/2005
Site Commissioning Tests - Resistors
$55.2
NG TS 3.05.15
Published Date: 05/01/2012
Technical Specifications - Mass Impregnated Cable for HVDC Voltages Up To 800KV
$147.3

Best-Selling Products

BMI MMPDS-04 Chapter 1
Published Date: 04/01/2008
Metallic Materials Properties Development and Standardization (MMPDS) Handbook, Chapter 1 - Introduction
$49.5
BMI MMPDS-04 Chapter 2
Published Date: 04/01/2008
Metallic Materials Properties Development and Standardization (MMPDS) Handbook, Chapter 2 - Steel Alloys
$72
BMI MMPDS-04 Chapter 3
Published Date: 04/01/2008
Metallic Materials Properties Development and Standardization (MMPDS) Handbook, Chapter 3 - Aluminum Alloys (Both Volumes A & B)
$118.5
BMI MMPDS-04 Chapter 4
Published Date: 04/01/2008
Metallic Materials Properties Development and Standardization (MMPDS) Handbook, Chapter 4 - Magnesium Alloys
$51
BMI MMPDS-04 Chapter 5
Published Date: 04/01/2008
Metallic Materials Properties Development and Standardization (MMPDS) Handbook, Chapter 5 - Titanium Alloys
$63
BMI MMPDS-04 Chapter 6
Published Date: 04/01/2008
Metallic Materials Properties Development and Standardization (MMPDS) Handbook, Chapter 6 - Heat Resistant Alloys
$64.5