NG TS 3.06.16 PDF

NG TS 3.06.16 PDF

Name:
NG TS 3.06.16 PDF

Published Date:
04/01/1999

Status:
[ Inactive ]

Description:

National Grid Technical Specifications - Protection for Double-Wound Transformers

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?
ARCHIVED

This Specification describes the functional and performance requirements for the protection of 400 and 275 kV oil-immersed supergrid double-wound transformers constructed in accordance with IEC 76 or equivalent. It does not include single phase transformers for railway traction supplies, for which reference should be made to Engineering and Technology.

There may be some installations such as supplies to steelworks or rolling mills where the load contains an excessive harmonic content which could adversely affect the performance of biased differential relays, (Refer to Appendix A). For such installations, additional information may be required and this will be specified in the contract.

The detailed requirements for backup protection of double wound transformers are specified in NGTS 3.6.7 Backup Protection.

The requirements of devices for mechanical protection including gas and oil actuated relays, and oil and winding temperature instruments are specified in NGTS 2.3 Transformers and Reactors. This Specification describes their function within the transformer electrical protection system.

The requirements for the protection of HV and LV connections associated with the double wound transformer are specified in NGTS 3.6.14 Copperwork Protection.

The requirements for the trip relay resetting scheme are specified in NGTS 3.6.15 Trip Relays and Trip Relay Resetting.


Edition : 2
File Size : 1 file , 150 KB
Number of Pages : 17
Published : 04/01/1999

History


Related products

NG TS 3.04.17
Published Date: 04/01/2014
Technical Specifications - Insulator Sets for Overhead Lines
$138
NG NGUK/CON/BP 178E
Published Date: 04/01/2009
UK Construction Business Procedures - Lessons Learnt Management Procedure
$55.2
NG TS 3.02.05
Published Date: 05/01/2010
Technical Specifications - Votage Transformers
$55.2
NG TS 3.04.26
Published Date: 08/01/2016
Technical Specifications - Aerial Lidar Surveying – Technical Specification
$55.2

Best-Selling Products

Tracing EMFs in Building Wiring & Grounding
Published Date: 04/01/1995
$8.4