NG TS 3.07.19 PDF

NG TS 3.07.19 PDF

Name:
NG TS 3.07.19 PDF

Published Date:
07/01/1995

Status:
[ Active ]

Description:

National Grid Technical Specifications - Local Control Point Facilities

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?

This Specification describes the functional and performance requirements of Local Control Point facilities at NGC substations.


Edition : 2
File Size : 1 file , 39 KB
Number of Pages : 7
Published : 07/01/1995

History


Related products

NG TS 3.24.99
Published Date: 02/01/2016
Technical Specifications - Protection & Control of a STATCOM for connection to 275kV & 400kV Systems
$138
NG TS 3.17.03
Published Date: 03/01/1995
National Grid Technical Specifications - Current Leakage Monitor for Insulating Foam Filled Tubes and Solid Rods (Current Leakage Monitor) Used During Live Line Working
$59.1
NG TS 3.24.63
Published Date: 05/01/2001
National Grid Technical Specifications - Mesh Station DAR and Plant Isolation
$55.2
NG UKBP/TP 106
Published Date: 04/01/2016
UK Business Procedure/Transmission Procedures - Equipment Commissioning & Decommissioning
$147.3

Best-Selling Products