NG TS 3.12.03 PDF

NG TS 3.12.03 PDF

Name:
NG TS 3.12.03 PDF

Published Date:
06/01/2006

Status:
[ Active ]

Description:

Technical Specifications - Substation Lvac Supplies

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?

PURPOSE AND SCOPE

This document defines the technical procurement requirements for 400V 3-phase LVAC power supplies systems, (previously referred to as 415 V supplies), within a substation.

It is intended to cater for the connection arrangements of primary LVAC equipment within a substation environment, ie switchgear distribution boards both within the LVAC room and remote secondary supply locations (if applicable), the standby diesel generator and its associated changeover panel facilities. It does not cover secondary equipment requirements installed away from the switchgear listed above, ie transformer marshalling kiosks and cooling circuits, interconnecting cables or any nonoperational specific equipment such as LVAC supplies to offices, blockhouses or stores all of which are all adequately covered by relevant British Standards.


Edition : 7
File Size : 1 file , 210 KB
Number of Pages : 22
Published : 06/01/2006

History


Related products

NG TGN(E) 237
Published Date: 02/01/2011
Technical Guidance Notes - Classification of Overhead Line High Risk Spans
$55.2
NG TS 3.24.16
Published Date: 05/01/2000
National Grid Technical Specifications - Delayed Automatic Reclosing (DAR)
$55.2
NG SCT 08.01
Published Date: 11/01/2013
Site Commissioning Tests - Interlocking
$55.2
NG DH 24
Published Date: 04/04/2014
Design Handbook - Guidance for Engineering Assurance Engineers
$55.2

Best-Selling Products

CS UK CAS01
Published Date: 01/01/2003
The provision of holes in reinforced concrete beams
$7.5
CS UK CAS02
Published Date: 01/01/2014
Suspended concrete floors: maximum size of pour allowable and location of construction joints
$6
CS UK CAS03
Published Date: 02/01/2014
Straightening and rebending reinforcement on site
$6
CS UK CAS04
Published Date: 01/01/2014
Congested reinforcement: effects on placing and compacting concrete
$6
CS UK CAS05
Published Date: 04/01/2014
Holding down bolts in concrete: Suggested design procedures to BS 8110-1
$7.5
CS UK CAS06
Published Date: 01/01/2003
Reinforcement ripple
$7.5