NG UKBP/TP 107 PDF

NG UKBP/TP 107 PDF

Name:
NG UKBP/TP 107 PDF

Published Date:
05/01/2014

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Protection and Control Relay Settings

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

PURPOSE AND SCOPE

The health of the Transmission System is critically dependent upon correct relay settings. It is therefore essential that this process is adhered to both rigorously and diligently.

The purpose of this procedure is to define the management process for the preparation, application, verification, dissemination, recording and auditing of protection and control relay settings. This procedure defines both the Client side (i.e. National Grid) tasks, responsibilities and levels of surveillance, and the Contractor side tasks and responsibilities.

The procedure applies to all protection and control relays owned by National Grid, or for which National Grid has entered into an arrangement to carry out and hold the settings. The procedure is formatted on the basis that relay settings calculations will be carried out by UKBP/TP141 authorised Contractor engineers either as part of a capital scheme, or as part of ongoing support through a Post Delivery Support Agreement (PDSA).

It is recognised that for investments of medium and low complexity the full application of this Transmission Procedure (TP) may not provide the most cost efficient means of delivering that investment and hence TP governance options as per UKBP/TP500 Appendix A - Attachment A3 can be applied to this procedure.

TP governance options defined in UKBP/TP500 Appendix A - Attachment A3 include those that are already detailed in this Transmission Procedure and those that are additional and not detailed in this Transmission Procedure.

Amendments to this procedure shall be reflected in UKBP/TP500 Appendix A – Attachment A3 (if required) and may result in re-issue of UKBP/TP500 within the same period.

The scope of this procedure covers all protection and control equipment which require a setting, including associated equipment such as current transformers and facility selection functions. It covers the settings process associated with

• the capital programme

• maintenance & operations

• following equipment failure

• third party interfaces as required by the Grid Code

• setting changes requested by Market Operation


Edition : 11
File Size : 1 file , 280 KB
Number of Pages : 58
Published : 05/01/2014

History

NG UKBP/TP 107
Published Date: 01/01/2019
UK Business Procedure/Transmission Procedures - Protection and Control Relay Settings
$138
NG UKBP/TP 107
Published Date: 05/01/2014
UK Business Procedure/Transmission Procedures - Protection and Control Relay Settings
$138

Related products

NG TS 3.08.08
Published Date: 02/01/1998
National Grid Technical Specifications - Fibre Optic Joint Boxes
$59.1
NG TS 3.01.08
Published Date: 05/01/2016
Technical Specifications - Laser Scanning & Photogrammetry Surveying Standard for Fixed Gas & Electrical Transmission Sites
$59.1
NG CH 19
Published Date: 01/01/2003
Commissioning Handbook - Primary and Secondary Injection of Double Wound Transformers and their Main Protections
$55.2
NG TS 3.06.06
Published Date: 11/01/1998
National Grid Technical Specifications - Protection for Static VAR Compensators
$55.2

Best-Selling Products

PDA PTC PUPSIT 1
Published Date: 02/01/2020
Points to Consider for Risks Associated with Sterilizing Grade Filters and Sterilizing Filtration
$97.5
PDA PTC PUPSIT 2
Published Date: 03/01/2020
Points to Consider for Implementation of Pre-Use Post-Sterilization Integrity Testing (PUPSIT)
$97.5
PDA TR 13-2
Published Date: 11/01/2020
Technical Report No. 13-2 Fundamentals of an Environmental Monitoring Program Annex 1: Environmental Monitoring of Facilities Manufacturing Low Bioburden Products
$97.5
PDA TR 13
Published Date: 06/01/2014
Technical Report 13 Revised, (TR 13) Fundamentals of an Environmental Monitoring Program
$97.5
PDA TR 13
Published Date: 04/22/2022
Technical Report 13 Revised 2022, (TR 13) Fundamentals of an Environmental Monitoring Program
$97.5
PDA TR 14
Published Date: 09/01/2008
PDA Technical Report No. 14 (TR 14) Validation of Column-Based Chromatography Processes for the Purification of Proteins
$97.5