NG UKBP/TP 136 PDF

NG UKBP/TP 136 PDF

Name:
NG UKBP/TP 136 PDF

Published Date:
05/01/2012

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Site Responsibility Schedules

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

PURPOSE AND SCOPE

The application of Safety Rules and operational procedures on Equipment at the operational interface needs to be consistent and easily understood by staff. The Grid Code requires National Grid Electricity Transmission (NGET) to produce Site Responsibility Schedules (SRS) for all Connection Sites and to inform site operational staff, NGET and Users Control Engineers of agreed responsibilities for Plant and Apparatus at the operational interface (Grid Code Connection Conditions CC.7.3.1).

The format, principles and basic procedures for the preparation are detailed in Grid Code Connection Conditions Appendix 1 (CC.A.1). As the SRSs are inter-company documents, Plant and Apparatus in the context of SRSs are as defined in the Grid Code not as defined in NGET Rules.

As NGET holds the transmission licence all SRSs shall refer to NGET


Edition : 3
File Size : 1 file , 170 KB
Number of Pages : 29
Published : 05/01/2012

History

NG UKBP/TP 136
Published Date: 12/01/2015
UK Business Procedure/Transmission Procedures - Site Responsibility Schedules
$138
NG UKBP/TP 136
Published Date: 05/01/2012
UK Business Procedure/Transmission Procedures - Site Responsibility Schedules
$138

Related products

NG TGN(E) 287
Published Date: 01/01/2016
Technical Guidance Notes - Third-Party Guidance for Working Near National Grid Electricity Transmission Equipment
$59.1
NG CH 01
Published Date: 01/01/2008
Commissioning Handbook - Model format for a Commissioning Programme
$55.2
NG SCT 37.04
Published Date: 05/01/2000
Site Commissioning Tests - ABB HSD50 PLC Intertripping and Protection Signalling Equipment
$55.2
NG NSBP 134
Published Date: 08/01/2005
Network Strategy Business Procedures - Project Delivery and Execution Requirements Procedure
$55.2

Best-Selling Products

AMCA 1011-03 (R2010)
Published Date: 01/01/2003
Certified Ratings Program Acoustical Duct Silencers
Free Download
AMCA 11-03 (R2008) (Rev.10/13)
Published Date: 2013
Certified Ratings Program Operating Manual
Free Download
AMCA 11-03 (R2008) (Rev. 5/11)
Published Date: 2011
Certified Ratings Program Operating Manual
Free Download
AMCA 11-22
Published Date: 2023
Certified Ratings Program Operating Manual
Free Download
AMCA 111-13
Published Date: 2013
Laboratory Accreditation Program
Free Download
AMCA 201-02 (R2011)
Published Date: 2002
Fans and Systems
$27