NG UKBP/TP 136 PDF

NG UKBP/TP 136 PDF

Name:
NG UKBP/TP 136 PDF

Published Date:
12/01/2015

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Site Responsibility Schedules

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

PURPOSE AND SCOPE

The application of Safety Rules and operational procedures on Equipment at the operational interface needs to be consistent and easily understood by staff. The Grid Code requires National Grid Electricity Transmission (NGET) to produce Site Responsibility Schedules (SRS) for all Connection Sites and to inform site operational staff, NGET and Users Control Engineers of agreed responsibilities for Plant and Apparatus at the operational interface (Grid Code Connection Conditions CC.7.3.1).

The format, principles and basic procedures for the preparation are detailed in Grid Code Connection Conditions Appendix 1 (CC.A.1).

As the SRSs are inter-company documents, Plant and Apparatus in the context of SRSs are as defined in the Grid Code not as defined in NGET Rules.

As NGET holds the transmission licence all SRSs shall refer to NGET.


Edition : 4
File Size : 1 file , 680 KB
Number of Pages : 29
Published : 12/01/2015

History

NG UKBP/TP 136
Published Date: 12/01/2015
UK Business Procedure/Transmission Procedures - Site Responsibility Schedules
$138
NG UKBP/TP 136
Published Date: 05/01/2012
UK Business Procedure/Transmission Procedures - Site Responsibility Schedules
$138

Related products

NG SCT 20.12.08
Published Date: 08/01/1998
Site Commissioning Tests - GEC Quadramho (SHPM) Distance Protection
$55.2
NG PS(T) 087
Published Date: 10/01/2009
Policy Statements - Overhead Line Separation From Wind Turbines
$138
NG PS(T) 010
Published Date: 04/01/2018
Policy Statements - Application and Protection Setting Policy for the National Grid UK Transmission System
$257.7
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138

Best-Selling Products

PFI ES11
Published Date: 01/01/1996
Permanent Marking on Piping Materials
PFI ES16
Published Date: 01/01/1985
Access Holes, Bosses and Plugs for Radiographic Inspection of Pipe Welds
PFI ES1
Published Date: 07/01/1995
Internal Machining & Solid Machined Backing Rings for Circumferential Butt Welds
PFI ES20
Published Date: 01/01/1997
Wall Thickness Measurement by Ultrasonic Examination
PFI ES21
Published Date: 01/01/1992
Internal Machining & Fit-Up of GTAW Root Pass Circumferential Butt Welds
PFI ES22
Published Date: 01/01/1995
Recommended Practice for Color Coding of Piping Materials