NG UKBP/TP 144 PDF

NG UKBP/TP 144 PDF

Name:
NG UKBP/TP 144 PDF

Published Date:
03/01/2014

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Assessment Process for Capital Delivery Project Management, CDM Management, Contractor Site Management Prior to Performing These Duties On National Grid Projects

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?

PURPOSE AND SCOPE This procedure defines the National Grid procedural requirements for personnel working on National Grid’s Electricity Transmission Assets, whilst delivering the Capital Plan on behalf of Capital Delivery. Roles requiring assessment are Capital Delivery Project Engineer, National Grid Development Engineer, Construction Interface Engineer, CDM Co-ordinator, TP153 Project Co-ordinator Chairman, Principal Contractors Site Manager and Contractor Site Manager. Temporary Works Coordinator is also referred to within this procedure, but it is not a National Grid assessed role. It must be noted by Employing organisation (National Grid Delivery Unit, Consultants/Framework Consultants, National Grid Development, Principal Contractors and Contractors) that the TP144 process is an assessment of the individual’s knowledge on the suite of National Grid Transmission Procedures, including general H&S and CDM knowledge, applicable to the role.

This is to ensure that the individual has sufficient knowledge and understanding to enable compliance with National Grid procedural and SHE requirements.

It is the Employing organisations responsibility to define the level of competency required to discharge their duties & nominate competent individuals with appropriate knowledge and experience for assessment in the discipline they are to enact on the project.

Personnel shall be assessed in these key roles as a demonstration of compliance with CDM Regulations and to demonstrate the control of activities to OFGEM and DECC.

It is recognised that for investments of medium and low complexity the full application of this Transmission Procedure (TP) may not provide the most cost efficient means of delivering that investment and hence

TP governance options as per UKBP/TP500 Appendix A can be applied to this procedure. TP governance options defined in UKBP/TP500 Appendix A include those that are already detailed in this Transmission Procedure and those that are additional and not detailed in this Transmission Procedure.

Amendments to this procedure shall be reflected in UKBP/TP500 Appendix A (if required) and may result in re-issue of UKBP/TP500 within the same period


Edition : 7
Number of Pages : 29
Published : 03/01/2014

History


Related products

NG SCT 37.04
Published Date: 05/01/2000
Site Commissioning Tests - ABB HSD50 PLC Intertripping and Protection Signalling Equipment
$55.2
NG TGN(E) 269
Published Date: 01/01/2014
Technical Guidance Notes - Settlement Metering – Overall Accuracy and Uncertainty
$138
NG TS 3.24.80
Published Date: 12/01/2000
National Grid Technical Specifications - Ferroresonance Detection
$55.2
NG TS 3.08.01
Published Date: 09/01/1992
National Grid Technical Specifications - Helicopter Radio
$59.1

Best-Selling Products

AIHA AEAB06-715
Published Date: 01/01/2006
Essential Air Monitoring Methods (MAK-Collection for Occupational Health and Safety)
$62.4
AIHA AEAG00-382
Published Date: 01/01/2000
Investigations: A Handbook for Prevention Professionals
$31.8
AIHA AEAG07-726
Published Date: 01/01/2007
Guidance for Conducting Control Banding Analyses
$36
AIHA AEAG99-381
Published Date: 01/01/2000
User's Guide to A Strategy for Assessing and Managing Occupational Exposures
AIHA AEAH07-725
Published Date: 01/01/2007
Preventing Hazards at the Source
$36.3
AIHA AEAH10-559
Published Date:
2010 ERPG & WEEL Handbook
$17.4