NG UKBP/TP 181 PDF

NG UKBP/TP 181 PDF

Name:
NG UKBP/TP 181 PDF

Published Date:
07/01/2013

Status:
[ Withdrawn ]

Description:

UK Business Procedure/Transmission Procedures - Continuous Improvement Within The Investment Process

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ng-ukbp-tp-181_2815691

Choose Document Language:
55.20 €
Need Help?

PURPOSE AND SCOPE

The purpose of this procedure is to promote and implement continuous improvement within the Investment process by:

􀂃 Creating a culture of observing and recognizing good or poor practice.

􀂃 Learning from past mistakes and successes.

􀂃 Sharing best practice.

In addition, the procedure provides an effective audit trial to demonstrate National Grid's commitment to continuous improvement as part of ISO 9001 and ISO 14001 quality accreditation requirements.

This procedure applies to all projects which comprise the UK Electricity Transmission Capital Delivery Investment programme.


Edition : 2
File Size : 1 file , 48 KB
Number of Pages : 8
Published : 07/01/2013

History


Related products

NG TS 2.28
Published Date: 02/01/2005
Technical Specifications - Substation Standard Bay Designs for Connection To The Ngt Transmission System
55.20 €
NG UKBP/TP 162
Published Date: 12/01/2018
UK Business Procedure/Transmission Procedures - Contingency Plans in Case of Failure of Numerical Busbar Protections
138.00 €
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
138.00 €
NG TGN(E) 285
Published Date: 05/01/2016
Technical Guidance Note - Laser Scan to Revit Modelling Standards - Existing Conditions for Electricity Transmission Sites
59.10 €

Best-Selling Products

Analytical Methods in Vibrations
Published Date: 03/01/1967
19.80 €