Name:
NG UKBP/TP 162 PDF
Published Date:
12/01/2018
Status:
[ Active ]
Publisher:
National Grid
PURPOSE AND SCOPE
This procedure details the requirements for the preparation of contingency plans to be implemented in the event of a failure, unplanned outage, planned depletion or asset replacement of a complete numerical busbar protection system fitted at a 400 or 275kV double busbar substation.
| Edition : | 6 |
| File Size : | 1 file , 220 KB |
| Number of Pages : | 18 |
| Published : | 12/01/2018 |