NG UKBP/TP 182 PDF

NG UKBP/TP 182 PDF

Name:
NG UKBP/TP 182 PDF

Published Date:
02/01/2015

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Management of Outstanding Works

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?

PURPOSE AND SCOPE

This procedure defines the management requirements for the identifying, reporting and resolution of outstanding works (e.g. defective workmanship) and non-conformances in the accordance with the requirements of the Network Development Process Map and its associated UKBP/TP500, ‘Network Development Process Map Enabling Document'.

This procedure identifies the roles and responsibilities for the management of outstanding works, following Network Development Process 4.4 – Project Execution Stage; to ensure all National Grid's contractual and procedural requirements are fully enacted.

This procedure shall apply to all projects within the UK Transmission Electricity Capital Programme.


Edition : 3
File Size : 1 file , 69 KB
Number of Pages : 9
Published : 02/01/2015

History

NG UKBP/TP 182
Published Date: 11/01/2018
UK Business Procedure/Transmission Procedures - Management of Outstanding Works
$55.2
NG UKBP/TP 182
Published Date: 02/01/2015
UK Business Procedure/Transmission Procedures - Management of Outstanding Works
$55.2
NG UKBP/TP 182
Published Date: 07/01/2013
UK Business Procedure/Transmission Procedures - Management of Outstanding Works
$55.2

Related products

NG TS 3.06.07
Published Date: 11/01/1998
National Grid Technical Specifications - Back-up Protection
$55.2
NG TS 3.04.02
Published Date: 03/01/2011
Technical Specifications - Conductors for Overhead Lines
$55.2
NG TS 2.04
Published Date: 08/01/2017
Technical Specifications - Generic Design Principles for Re-Utilisation of Overhead Lines
$172.5
NG CH 05
Published Date: 06/01/1998
Commissioning Handbook - Mandatory Items of Commissioning Practice
$55.2

Best-Selling Products

CEN CEN ISO/TS 15213-3
Published Date: 05/01/2024
Microbiology of the food chain - Horizontal method for the detection and enumeration of Clostridium spp. - Part 3: Detection of Clostridium perfringens
CEN CEN/TS 1317-7
Published Date: 11/01/2023
Road restraint systems -Part 7: Performance characterisation and test methods for terminals of safety barriers
CEN CEN/TS 14175-5
Published Date: 08/01/2006
Fume cupboards - Part 5: Recommendations for installation and maintenance
CEN CEN/TS 17048
Published Date: 01/01/2024
Flexible sheets for waterproofing - Plastic and rubber sheets for waterproofing of concrete bridge decks and other trafficked areas of concrete - Definitions and characteristics
CEN EN 10178
Published Date: 06/01/2024
Steels - Determination of niobium - Spectrophotometric method
CEN EN 10216-4
Published Date: 05/01/2002
Seamless Steel Tubes for Pressure Purposes - Technical Delivery Conditions - Part 4: Non-alloy and alloy steel tubes with specified low temperature properties