NG UKBP/TP 188 PDF

NG UKBP/TP 188 PDF

Name:
NG UKBP/TP 188 PDF

Published Date:
08/01/2018

Status:
[ Active ]

Description:

UK Business Procedure/Transmission Procedures - Transmission Capital Delivery Electricity - Design Management

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$172.5
Need Help?

PURPOSE AND SCOPE

This procedure is an implementation of the specific requirements in the Network Development Process Map and its associated UKBP_TP500, ‘Network Development Process Map Enabling Document’ relating to Design Management tasks which are the responsibility of National Grid, Capital Delivery Technical Assurance (CDTA) and a definition of the minimum required deliverables of the Contractor Design Approval (i.e. design production) process which is the responsibility of the respective Contractor

Note: The system design activities undertaken by National Grid Electrical Transmission Asset Management (ETAM) are exempt from this procedure.

The purpose of this procedure is to define arrangements that ensure the following;

a) That National Grid discharges its legal obligations with regard to health, safety and environmental requirements.

b) That project design is undertaken in accordance with National Grid technical policy and the suite of technical specifications and supporting documents.

c) That the design solution is fully specified, integrated and holistic across all technical disciplines, and is executed efficiently both to negate errors and to optimise the use of design engineering resources and skills.

d) That for reasons of maximising both Safety, Health, Environmental & Safety (SHES) performance and power system reliability those undertaking defined project design tasks possess a demonstrable minimum skill set in accordance with the requirements of UKBP_TP141.

e) That project design is undertaken with a demonstrable level of technical governance from both the National Grid and Contractor perspective – resulting in an effective audit trail.

f) That the project design provides an appropriate balance of practicable compliant design with an efficient cost and effective sustainable solution.

This procedure shall apply to all technical disciplines across all investments which comprise the National Grid Electricity capital programme.

It has been written such that its application is independent of any project contractual arrangements National Grid might have in place and in this context its jurisdiction is limited to decisions relating to the technical content of the design only. Where the contract mandates a specific requirement (for example the Project Managers contractual acceptance of design) this procedure shall be applied to support that process not supersede or replace it. All those with defined responsibilities (see below) shall ensure that the relevant contractual requirements are appropriately observed at all times.

A diagram showing the key stages of the project design process relevant to this procedure is provided within UK_BPTP500 – Section 4.

It is recognised that for investments that fall in to the category of single asset replacement /refurbishment/recondition (as defined in UKBP_TP236) then the full application of this TP may not provide the most cost efficient means of delivering that investment and hence TP minimum requirements as defined in UKBP_TP236 can be applied.

These minimum requirements are defined for each type of single asset replacement/ refurbishment/ recondition investment and are presented as separate appendices in UKBP_TP236. e.g. Appendix B CB Replacement (with CT’s) & (without CT’s)

Amendments to this procedure shall be reflected in UKBP_TP236 Appendices (if required) and may result in re-issue of UKBP_TP236 within the same period.


Edition : 8
File Size : 1 file , 790 KB
Number of Pages : 33
Published : 08/01/2018

History

NG UKBP/TP 188
Published Date: 08/01/2018
UK Business Procedure/Transmission Procedures - Transmission Capital Delivery Electricity - Design Management
$172.5
NG UKBP/TP 188
Published Date: 01/01/2018
UK Business Procedure/Transmission Procedures - TRANSMISSION CAPITAL DELIVERY ELECTRICITY - DESIGN MANAGEMENT
$138
NG UKBP/TP 188
Published Date: 05/01/2015
UK Business Procedure/Transmission Procedures - Transmission Capital Delivery Electricity - Design Management

Related products

NG TS 3.24.79
Published Date: 05/01/2001
National Grid Technical Specifications - Data Acquisition Equipment at Sites Remote to National Grid Substations
$55.2
NG SCT 32.02
Published Date: 07/01/1998
Site Commissioning Tests - Remote Substation Controller
$55.2
NG TS 3.24.17
Published Date: 08/01/2000
National Grid Technical Specifications - Ferroresonance Suppression
$55.2
NG TS 3.11.01
Published Date: 04/01/2011
Technical Specifications - Shunt Capacitors and Capacitor Banks
$55.2

Best-Selling Products

IEEE 1-2000
Published Date: 04/30/2001
IEEE Recommended Practice - General Principles for Temperature Limits in the Rating of Electrical Equipment and for the Evaluation of Electrical Insulation
$36.9
IEEE 1000-1987
Published Date: 10/13/1988
IEEE Standard for an 8-Bit Backplane Interface: STEbus
$65.1
IEEE 1001-1988
Published Date: 04/03/1989
IEEE Guide for Interfacing Dispersed Storage and Generation Facilities with Electric Utility Systems
$38.4
IEEE 1003.0-1995
Published Date: 11/30/1994
IEEE Guide to the POSIX Open System Environment (OSE)
$69
IEEE 1003.1-2001/Cor 1-2002
Published Date: 05/07/2003
IEEE Standard for Information Technology -- Portable Operating System Interface (POSIX(TM)) -- Technical Corrigendum 1
Free Download
IEEE 1003.1-2001/Cor 2-2004
Published Date: 04/02/2004
IEEE Standard for Information Technology - Portable Operating System Interface (POSIX(TM)) - Technical Corrigendum 2
Free Download