NG UKBP/TP 236 PDF

NG UKBP/TP 236 PDF

Name:
NG UKBP/TP 236 PDF

Published Date:
04/01/2016

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedure - Key Transmission Procedure Minimum Requirements As Applied To The Delivery of Electricity Transmission Single Asset Replacement/Refurbishment/Recondition Investments

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$147.3
Need Help?

PURPOSE AND SCOPE

This procedure defines the key Transmission Procedure (TP) minimum requirements as applied to the delivery of Electricity Transmission single asset replacement/refurbishment/recondition investments.

Investments in the National Grid Electricity Transmission System that are subject to the requirements of the Network Development Process (NDP) framework shall be delivered utilising the suite of relevant Transmission Procedures (TP). (Note: UKBP/TP500 and the Network Development Process Map jointly define the Network Development Process framework).

It is recognised that for investments that fall in to the category of single asset replacement /refurbishment/recondition that are typically of a short duration then the full application of a relevant TP may not provide the most cost efficient means of delivering that investment and as such agreed key Transmission Procedure (TP) minimum requirements can be applied. These key TP minimum requirements are grouped together for each type of single asset replacement/refurbishment/ recondition investment and presented as separate appendices in this procedure. e.g. Appendix A CB Replacement (with CT’s) & (without CT’s)

Each appendix shall be approved by Capital Delivery (CD) Technical Assurance (TA) Technical Assurance Manager and ETAM Engineering Project Manager.

Furthermore this procedure shall be read in conjunction with the TGN(E) 286 which defines the associated technical guidance and agreed Technical deviations to NG Technical Specifications (TS) for the delivery of Single Asset Replacement/Refurbishment/Reconditioning Investments. The technical guidance and agreed technical deviations are grouped together for each type of single asset replacement/refurbishment/ recondition investment and presented as separate appendices in TGN (E) 286. e.g. Appendix A CB Replacement (with CT’s) & (without CT’s).

Note: UKBP/TP236 Appendices and TGN(E) 286 Appendices shall correspond to each other when applied to the same type of single asset replacement/refurbishment/recondition investments

Investments that are not defined in this procedure shall comply fully with the requirements of the UKBP/Transmission procedures where applicable.


Edition : 2
File Size : 1 file , 930 KB
Number of Pages : 66
Published : 04/01/2016

History

NG UKBP/TP 236
Published Date: 04/01/2018
UK Business Procedure/Transmission Procedure - Key Transmission Procedure Minimum Requirements as Applied to The Delivery of Electricity Transmission Single Asset Replacment/refurbishment/recondition Investments
$147
NG UKBP/TP 236
Published Date: 08/01/2016
UK Business Procedure/Transmission Procedure - Key Transmission Procedure Minimum Requirements as Applied to The Delivery of Electricity Transmission Single Asset Replacment/refurbishment/recondition Investments
$147.3
NG UKBP/TP 236
Published Date: 04/01/2016
UK Business Procedure/Transmission Procedure - Key Transmission Procedure Minimum Requirements As Applied To The Delivery of Electricity Transmission Single Asset Replacement/Refurbishment/Recondition Investments
$147.3
NG UKBP/TP 236
Published Date: 02/01/2016
UK Business Procedure/Transmission Procedure - Key Transmission Procedure Minimum Requirements As Applied To The Delivery of Electricity Transmission Single Asset Replacement/Refurbishment/Recondition Investments
$138

Related products

NG SCT 20.12.12
Published Date: 08/01/1999
Site Commissioning Tests - ABB REL 531 Distance Protection
$55.2
NG TGN(T) 064
Published Date: 01/01/1995
Technical Guidance Notes - Instantaneous High-Impedance Protection
$55.2
NG TGN(E) 286
Published Date: 11/01/2018
Technical Guidance Notes - Technical Guidance and Technical Deviations to NGET Technical Specification as Applied to Single Asset Replacement/Refurbishment/Recondition Investments
$59.1
NG TGN(E) 176
Published Date: 08/01/2001
Technical Guidance Notes - Sequential Disconnection on the 275 kV and 400 kV Networks
$138

Best-Selling Products

BS EN ISO 1:2002
Published Date: 09/20/2002
Geometrical product specifications (GPS). Standard reference temperature for geometrical product specification and verification
$48.006
BS EN ISO 10007:1997
Published Date: 02/15/1996
Quality management. Guidelines for configuration management
$79.248
BS EN ISO 10012:2003
Published Date: 08/04/2003
Measurement management systems. Requirements for measurement processes and measuring equipment
$79.248
BS EN ISO 10052:2004+A1:2010
Published Date: 08/31/2010
Acoustics. Field measurements of airborne and impact sound insulation and of service equipment sound. Survey method
$92.964
BS EN ISO 10052:2004
Published Date: 01/06/2005
Acoustics. Field measurements of airborne and impact sound insulation and of service equipment sound. Survey method
$54.102
BS EN ISO 10052:2021
Published Date: 07/29/2021
Acoustics. Field measurements of airborne and impact sound insulation and of service equipment sound. Survey method
$92.964