NG UKBP/TP 500 PDF

NG UKBP/TP 500 PDF

Name:
NG UKBP/TP 500 PDF

Published Date:
01/01/2015

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Network Development Process Map Enabling Document

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

PURPOSE & SCOPE

This procedure is the enabling document for the Network Development Process (NDP) map. This procedure and the NDP map jointly define the Network Development Process framework and should be used together. 

The purpose of the NDP framework is to manage decision-making, optioneering, development, sanction, delivery and closure for all National Grid Electricity Transmission Owner investments in the regulated business, with the exception of IT and NG Property investments. The categories of investment covered by the NDP framework are listed in Appendix B. When unlicensed works are intrinsically linked to licensed works, these should also be developed within the framework of the NDP.

The aim of the end-to-end process is to deliver the lowest whole-life cost, fit-for-purpose projects required to meet the needs of our customers and stakeholders. The purpose of the process is to ensure that we do this:

• Consistently;

• To the quality required by our stakeholders;

• In a timely fashion;

• In a controlled and measurable way;

• With minimal waste and re-work across the business.


Edition : 3
File Size : 1 file , 170 KB
Number of Pages : 21
Published : 01/01/2015

History

NG UKBP/TP 500
Published Date: 01/01/2015
UK Business Procedure/Transmission Procedures - Network Development Process Map Enabling Document
$138
NG UKBP/TP 500
Published Date: 01/01/2014
UK Business Procedure/Transmission Procedures - Network Development Process Map Enabling Document
$138

Related products

NG NGUK/CON/BP 136E
Published Date: 01/01/2008
UK Construction Business Procedures - Safety, Health & Environmental (SHE) Auditing / Inspection Procedure
$55.2
NG NGUK/CON/BP 178E
Published Date: 04/01/2009
UK Construction Business Procedures - Lessons Learnt Management Procedure
$55.2
NG TS 3.24.07
Published Date: 05/01/2000
National Grid Technical Specifications - Feeder Bay Functions
$55.2
NG TS 2.13
Published Date: 04/01/1998
Technical Specifications (NGTS) - Electronic Equipment
$55.2

Best-Selling Products

NAVY AN-T-74
Published Date: 08/16/1944
TAPE; SILK
$9
NAVY DI-ILSS-80833 CANC NOTICE 1
Published Date: 05/09/2022
DAMAGED RETROGRADE SCREENING REPORT
$8.1
NAVY DI-ILSS-80833
Published Date: 05/31/1989
DAMAGED RETROGRADE SCREENING REPORT
$16.2
NAVY DI-ILSS-80834 CANC NOTICE 1
Published Date: 05/09/2022
CONSUMABLE PARTS BONDROOM/INVENTORY AND PARTS USAGE REPORT
$8.1
NAVY DI-ILSS-80834
Published Date: 05/31/1989
CONSUMABLE PARTS BONDROOM/INVENTORY AND PARTS USAGE REPORT
$16.5
NAVY DI-ILSS-80835 CANC NOTICE 1
Published Date: 05/09/2022
COMMERCIALLY REWORKED END ITEMS, MONTHLY STATUS REPORT
$8.1