NG UKBP/TP 500 PDF

NG UKBP/TP 500 PDF

Name:
NG UKBP/TP 500 PDF

Published Date:
01/01/2015

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Network Development Process Map Enabling Document

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

PURPOSE & SCOPE

This procedure is the enabling document for the Network Development Process (NDP) map. This procedure and the NDP map jointly define the Network Development Process framework and should be used together. 

The purpose of the NDP framework is to manage decision-making, optioneering, development, sanction, delivery and closure for all National Grid Electricity Transmission Owner investments in the regulated business, with the exception of IT and NG Property investments. The categories of investment covered by the NDP framework are listed in Appendix B. When unlicensed works are intrinsically linked to licensed works, these should also be developed within the framework of the NDP.

The aim of the end-to-end process is to deliver the lowest whole-life cost, fit-for-purpose projects required to meet the needs of our customers and stakeholders. The purpose of the process is to ensure that we do this:

• Consistently;

• To the quality required by our stakeholders;

• In a timely fashion;

• In a controlled and measurable way;

• With minimal waste and re-work across the business.


Edition : 3
File Size : 1 file , 170 KB
Number of Pages : 21
Published : 01/01/2015

History

NG UKBP/TP 500
Published Date: 01/01/2015
UK Business Procedure/Transmission Procedures - Network Development Process Map Enabling Document
$138
NG UKBP/TP 500
Published Date: 01/01/2014
UK Business Procedure/Transmission Procedures - Network Development Process Map Enabling Document
$138

Related products

NG NGUK/CON/BP 136E
Published Date: 01/01/2008
UK Construction Business Procedures - Safety, Health & Environmental (SHE) Auditing / Inspection Procedure
$55.2
NG NGUK/CON/BP 178E
Published Date: 04/01/2009
UK Construction Business Procedures - Lessons Learnt Management Procedure
$55.2
NG TS 3.24.07
Published Date: 05/01/2000
National Grid Technical Specifications - Feeder Bay Functions
$55.2
NG TS 2.13
Published Date: 04/01/1998
Technical Specifications (NGTS) - Electronic Equipment
$55.2

Best-Selling Products

ISO/ASTM 51026:2015
Published Date: 07/15/2015
Practice for using the Fricke dosimetry system
$24.3
ISO/ASTM 51204:2004
Published Date: 08/01/2004
Practice for dosimetry in gamma irradiation facilities for food processing
$10.5
ISO/ASTM 51205:2009
Published Date: 01/01/2009
Practice for use of a ceric-cerous sulfate dosimetry system
ISO/ASTM 51205:2017
Published Date: 07/15/2015
Practice for use of a ceric-cerous sulfate dosimetry system
$20.4
ISO/ASTM 51261:2002
Published Date: 03/01/2002
Guide for selection and calibration of dosimetry systems for radiation processing
$12.3
ISO/ASTM 51261:2013
Published Date: 04/15/2013
Practice for calibration of routine dosimetry systems for radiation processing
$37.2