NG UKBP/TP 500 PDF

NG UKBP/TP 500 PDF

Name:
NG UKBP/TP 500 PDF

Published Date:
01/01/2014

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Network Development Process Map Enabling Document

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

PURPOSE & SCOPE

This procedure is the enabling document for the Network Development Process (NDP) map. This procedure and the NDP map jointly define the Network Development Process framework and should be used together.

The purpose of the NDP framework is to manage decision-making, optioneering, development, sanction, delivery and closure for all National Grid Electricity Transmission Owner investments in the regulated business, with the exception of IT and NG Property investments. The categories of investment covered by the NDP framework are listed in Appendix B. When unlicensed works are intrinsically linked to licensed works, these should also be developed within the framework of the NDP.

The aim of the end-to-end process is to deliver the lowest whole-life cost, fit-for-purpose projects required to meet the needs of our customers and stakeholders. The purpose of the process is to ensure that we do this:

• Consistently;

• To the quality required by our stakeholders;

• In a timely fashion;

• In a controlled and measurable way; • With minimal waste and re-work across the business.


Edition : 2
File Size : 1 file , 260 KB
Number of Pages : 20
Published : 01/01/2014

History

NG UKBP/TP 500
Published Date: 01/01/2015
UK Business Procedure/Transmission Procedures - Network Development Process Map Enabling Document
$138
NG UKBP/TP 500
Published Date: 01/01/2014
UK Business Procedure/Transmission Procedures - Network Development Process Map Enabling Document
$138

Related products

NG TS 3.06.05
Published Date: 08/01/1999
National Grid Technical Specifications - Protection Signalling Systems (Command Teleprotection)
$55.2
NG SCT 40
Published Date: 08/01/1998
Site Commissioning Tests - High Speed Digital Intertripping Equipment, HSDI-3
$55.2
NG TS 2.09
Published Date: 03/01/1999
National Grid Technical Specifications - Settlement Metering and General Measuring Equipment
$55.2
NG TS 3.04.15
Published Date: 12/01/2012
Technical Specifications - Overhead Line Support Foundations
$138

Best-Selling Products

AHAM AC-1-2006
Published Date: 2006
Air Cleaners - Portable - CADR
$30
AHAM AC-1-2018
Published Date: 2018
Method for Measuring Performance of Portable Household Electric Room Air Cleaners
$33
AHAM AC-1-2020
Published Date: 12/14/2020
Method for Measuring Performance of Portable Household Electric Room Air Cleaners
$33
AHAM AC-2-2006 (R2016)
Published Date: 2006
Method for Sound Testing of Portable Household Electric Room Air Cleaners
$12
AHAM AC-3-2009
Published Date: 2009
Room Air Cleaners
$12
AHAM AC-4-2022
Published Date: 07/22/2022
Method of Assessing the Reduction Rate of Chemical Gases by a Room Air Cleaner
$60