NR BR 1651 PART 3 PDF

NR BR 1651 PART 3 PDF

Name:
NR BR 1651 PART 3 PDF

Published Date:
03/01/1991

Status:
[ Active ]

Description:

Fibre Optic Banner Signal

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This specification covers the requirements for a Banner Signal using Fibre Optic Light guides.

The Signal is required to display a circular lit indication on which there is superimposed either a horizontal unlit (black) bar for the ‘ON' aspect or a diagonal unlit (black) bar for the ‘OFF' aspect.

The ‘ON' aspect indication is to be achieved using a split light box fitted with two lamp units, each fed from an individual transformer, so as to ensure that both semi-circular lit areas of the ‘ON' indication will be illuminated at approximately half the luminous intensity if one lamp unit fails.

The semi-circular lit areas of the ‘OFF' aspect indication are to be illuminated together from a single designated lamp unit and individual transformer


File Size : 1 file , 700 KB
Number of Pages : 22
Published : 03/01/1991

History


Related products

NR NR/L2/SIG/11201/MODA03 ISSUE 4
Published Date: 06/04/2011
Signalling Design Handbook: Assessment of Signalling Systems Before Signalling Design Alterations
$7.5
NR NR/L3/ELP/29987/MOD X ISSUE 5
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Securing of Points of Disconnection for Earthed Isolations on New Electrification Infrastructure
$13.2
NR NR/L3/INF/02226 ISSUE 3
Published Date: 12/02/2017
Corporate Records Retention Schedule
$13.2
NR RT/E/WI/00011 ISSUE 1
Published Date: 02/01/2001
Signalling Maintenance Work Instruction Control Equipment
$18.6

Best-Selling Products

HIR FTV RP 2007
Published Date: 03/01/2018
In-service Inspection of Aboveground Atmospheric Fiberglass Reinforced Plastic Tanks and Vessels
$69
HIR FTV RP 2007
Published Date: 01/03/2023
In-service Inspection of Aboveground Atmospheric Fiberglass Reinforced Plastic Tanks and Vessels, Recommended Practice 2007(c)
$79.5
HIR Publication 2023
Published Date: 12/31/2023
A publication providing insights into the methods used to repair small, existing, shop-fabricated steel Above-ground, Atmospheric Pressure, Vented, Tanks designed and used for Petroleum and Non- Petroleum storage
$47.7