NR NB 107 ISSUE 2 PDF

NR NB 107 ISSUE 2 PDF

Name:
NR NB 107 ISSUE 2 PDF

Published Date:
01/13/2012

Status:
[ Withdrawn ]

Description:

Signalling Failure Investigation - Consideration of Possible Causes

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
W/D * PDF ONLY

This Notice Board is intended for persons carrying out Signalling Failure Investigations in accordance with the current Signalling Maintenance Testing Handbook (NR/L3/SIG/11231 Issue 4) Part 5. It applies to persons holding Levels 1, 2 and 3 of the escalation and sign-back authority defined in NR/SMTH/Part 5/S001, but in particular to staff responsible for final approval (L2 or L3) who should make sure that they consider possible causes broadly and challenge teams seeking to sign-back into use equipment that has been alleged to have failed wrong-side, so that the risk of missing a wrong-side failure mode is minimised.

Purpose

This Notice Board explains the circumstances in which a possible scenario which could have led to a SPAD occurring was missed during Signalling Failure Investigation. It is issued as a "lessons learned" exercise to remind persons carrying out such investigations to think broadly about possible causes of a reported failure.


Edition : 2
File Size : 1 file , 37 KB
Number of Pages : 3
Published : 01/13/2012

History


Related products

NR NR/CIV/SD/1301 ISSUE H
Published Date: 03/01/2019
U-Type Underbridges: Key to Types
$5.7
NR RT/CE/S/049 ISSUE 1A
Published Date: 12/01/1997
Track Design Handbook
$7.5
NR NR/L3/OPS/045/3.30 ISSUE 2
Published Date: 06/02/2018
National Operating Procedure (NOP) 3.30: Detailed Assessment for Determining Suitability of Single Lines for Modified Working and Authorising the Use of Modified Working
$7.5
NR NR/L3/CIV/140/079N ISSUE 2
Published Date: 03/06/2010
Model Clause 079N: Sheet Pile Walls
$5.7

Best-Selling Products