NR NB 122 ISSUE 1 PDF

NR NB 122 ISSUE 1 PDF

Name:
NR NB 122 ISSUE 1 PDF

Published Date:
02/18/2013

Status:
[ Withdrawn ]

Description:

Wig-Wags with the Potential to Be Affected by Sunlight and Remedial Action.

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
W/D * PDF ONLY

The Scope of this Notice Board covers all level crossings fitted with Wig-Wags and applies to Signalling Maintenance staff and Level Crossing Inspector Maintainers (LCIM).

Purpose

The purpose of this Notice Board is to give guidance to technicians that will allow them to progress the necessary action at any level crossing fitted with flashing Road Traffic Lights (RTL) commonly known as Wig-Wags that could be affected by sunlight, either on the low horizon or as a result of swamping.


Edition : 1
File Size : 1 file , 45 KB
Number of Pages : 2
Published : 02/18/2013

History


Related products

NR R25160 ISSUE 1
Published Date: 03/06/2010
Route Relay Interlocking, Typical Circuits Points Power Points, Control and Detection (All Types) where Motor Cut Off Timer is Situated at the Interlocking Through Circuits via Repeater Location
$5.7
NR NR/L3/MTC/II0219/02 ISSUE 4
Published Date: 06/03/2023
Management of Alerts and Alarms from Remote Condition Monitoring
$13.2
NR SF/CTM/301A ISSUE 1
Published Date: 06/05/2010
Advisory Visit Criteria Delivery Centre
$5.7
NR NR/L2/SIG/11201/MOD B20 ISSUE 2
Published Date: 03/04/2023
Signalling Design Handbook: Guidance for the Application of Temporary Speed Restriction (TSR) and Emergency Speed Restriction (ESR) Designs
$24.3

Best-Selling Products