NR NB 125/1 ISSUE 2 PDF

NR NB 125/1 ISSUE 2 PDF

Name:
NR NB 125/1 ISSUE 2 PDF

Published Date:
07/16/2014

Status:
[ Withdrawn ]

Description:

'Simple is Effective' Trailing, Facing & Flank Point Detection within the Overlap

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
W/D * PDF ONLY

This Notice Board applies to all projects amending or creating all types of data driven and circuitry systems.

Purpose

This Notice Board supports the ‘Simple is Effective' campaign and provides guidance to signalling system designers and engineers on the provision of Trailing, Facing and Flank Point detection within the Overlap.


Edition : 2
File Size : 1 file , 50 KB
Number of Pages : 3
Published : 07/16/2014

History


Related products

NR NR/L2/SIG/30014/D120/TS10-10 ISSUE 2
Published Date: 09/03/2022
Signalling Works Testing Handbook: Block System Signalling Works Test Specification
$5.7
NR SMF/SE/0238 ISSUE 1
Published Date: 09/01/2006
Maintenance Safety Annual Plan Form
$5.7
NR NR/L2/TEL/30111 ISSUE 2
Published Date: 03/07/2009
Specification for the Maintenance of CCTV Monitoring Equipment
$7.5
NR TPWS/TI/043 ISSUE 1
Published Date: 03/01/2003
TPWS+ Signalling Interface Requirements for Retro-Fitment
$18.6

Best-Selling Products

ALSC PS 20
Published Date: 10/01/2021
American Softwood Lumber Standard
ALSC PS 20
Published Date: 01/01/2005
American Softwood Lumber Standard
ALSC PS 20
Published Date: 06/01/2010
American Softwood Lumber Standard