Name:
NR NB 189 ISSUE 1 PDF
Published Date:
05/22/2020
Status:
[ Withdrawn ]
Publisher:
Network Rail
Signalling works as part of failure rectification or planned renewal of previously working signalling equipment that is be subject to SMTH testing.
Purpose
The purpose of this notice board is to clarify the competency requirements for carrying out replacement or installation of signalling equipment, that is subject to SMTH (Signalling Maintenance Testing Handbook) testing.
| Edition : | 1 |
| File Size : | 1 file , 91 KB |
| Number of Pages : | 2 |
| Published : | 05/22/2020 |