NR NR/L3/ELP/29987/MOD04 ISSUE 8 PDF

NR NR/L3/ELP/29987/MOD04 ISSUE 8 PDF

Name:
NR NR/L3/ELP/29987/MOD04 ISSUE 8 PDF

Published Date:
09/03/2022

Status:
[ Active ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Maintaining the Integrity and Safe Operation of 25 kV A.C. Electrified Lines

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module states the requirements for maintaining the integrity and safe and efficient operation of the 25 kV a.c. electrification system, through attention to the position of the overhead line equipment relative to the track, to traction bonding, and to automatic power control inductors.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard to infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z).

Purpose

Compliance with this module will preserve the integrity of the 25 kV a.c. electrification system and promote its safe and efficient operation through requirements and controls for its physical condition, electrical continuity and relationship with other infrastructure systems.

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC) and Handbook HB16 (GE/RT8000/HB16).


Edition : 8
File Size : 1 file , 240 KB
Number of Pages : 12
Published : 09/03/2022

History

NR NR/L3/ELP/29987/MOD04 ISSUE 8
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Maintaining the Integrity and Safe Operation of 25 kV A.C. Electrified Lines
$13.2
NR NR/L3/ELP/29987/MOD04 ISSUE 7
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Maintaining the Integrity and Safe Operation of 25 kV A.C. Electrified Lines
$13.2
NR NR/L3/ELP/29987/MOD04 ISSUE 6
Published Date: 09/04/2021
Working on or About 25 kV A.C. Electrified Lines: Maintaining the Integrity and Safe Operation of 25 kV A.C. Electrified Lines
$13.2
NR NR/L3/ELP/29987/MOD04 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Maintaining the Integrity and Safe Operation of 25 kV A.C. Electrified Lines
$24.3

Related products

NR NR/CIV/SD/105 ISSUE B
Published Date: 09/02/2017
Brick & Masonry Repairs: Single Ring Re-Casing of Defective Brickwork in Arches & Tunnel Linings Up to 4 Rings
$5.7
NR BRS-SM 545 ISSUE A
Published Date: 09/12/1990
Insulating Bush for Point Drive Bar
$5.7
NR BRS-SM 2556
Published Date: 01/30/1995
Mechanical Backdrive Mounted in 4' on LHS for Full Depth FV Layout Point Machine Mounted on RHS
$5.7
NR NR/L2/SIG/30009/H060 ISSUE 3
Published Date: 09/07/2024
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Train Protection and Automatic Warning Systems
$13.2

Best-Selling Products