NR NB 208 ISSUE 2 PDF

NR NB 208 ISSUE 2 PDF

Name:
NR NB 208 ISSUE 2 PDF

Published Date:
11/30/2022

Status:
[ Revised ]

Description:

Solid State Interlocking (SSI) Obsolescence

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

This Notice Board applies to all SSI equipment, including (but not limited to):

• Trackside eg TFM(Points),TFM(Signal), DLMs, LDTs

• Central interlocking eg MPMs, PPMs, MMs and the interlocking cubicles themselves(which forms an ideal store)

• Associated plug coupler components and plug coupled wiring harnesses (~200mm)

• Test gear eg Telegram Generators, Integrators

It does not apply to surge protection devices eg Data Link Isolating Transformers, ‘Furse’ Units etc.

It does not apply to modules removed under fault response by maintenance which should continue to be sent for repair and return using the normal process.

If in any doubt, keep it!

Purpose 

The purpose of this Notice Board is to ensure that SSI (Solid State Interlocking) equipment recovered by projects, maintenance, or other works, is retained, and stored in a safe manner and not scrapped or otherwise disposed of. 

Also to advise that new SSI modules and manufacturer support may cease to be available from 2027, and that the availability of some spares and the ability to repair modules will decline rapidly thereafter.


Edition : 2
File Size : 1 file , 150 KB
Number of Pages : 3
Published : 11/30/2022

History

NR NB 208 ISSUE 3
Published Date: 01/23/2024
Solid State Interlocking (SSI) Obsolescence
$5.7
NR NB 208 ISSUE 2
Published Date: 11/30/2022
Solid State Interlocking (SSI) Obsolescence
$5.7
NR NB 208 ISSUE 1
Published Date: 01/10/2022
Recovered Solid State Interlocking (SSI) Equipment
$5.7

Related products

NR SSI8003-102E ISSUE 1
Published Date: 12/01/2002
SSI Data Preparation - Core Data for Level Crossings - Bi-Directional Track - One Signal - Chapter E: Multiple Track Circuits & Alternative Treadles (aka RT/SSI/8003-102E)
$5.7
NR NR/WI/TRK/001 ISSUE 1
Published Date: 10/01/2005
Track Inspection Handbook
$13.2
NR NR/L3/TRK/3202 ISSUE 3
Published Date: 08/26/2008
Management of Track Geometry Recording and Remedial Actions
$13.2
NR NR/L3/OCS/044/FS-39B ISSUE 1
Published Date: 06/04/2011
Managed Stations Manual: Station Security Plan - Restricted - Station Security Committee
$5.7

Best-Selling Products

3A 00-00
Published Date: 09/08/2014
3-A Sanitary Standards for General Requirements
3A 00-01-2018
Published Date: 02/01/2018
3-A Sanitary Standard for General Requirements
$105
3A 00-01
Published Date: 06/05/2017
3-A Sanitary Standard for General Requirements
3A 01-08
Published Date: 11/20/2001
Storage Tanks for Milk and Milk Products
3A 01-09
Published Date: 11/19/2013
Insulated Tanks
$59.7
3A 02-09
Published Date: 11/01/1996
Centrifugal and Positive Rotary Pumps for Milk and Milk Products