NR NR/FP C300 ISSUE 4 PDF

NR NR/FP C300 ISSUE 4 PDF

Name:
NR NR/FP C300 ISSUE 4 PDF

Published Date:
09/03/2011

Status:
[ Active ]

Description:

Plant & Equipment Work Instructions: Unmanned Lineside Building Services

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

General

a) Check that any high/low temperature readings in the building are within tolerance.

b) Check all units for damage, security, cleanliness and correct operation in all modes.

c) Check that any air flows are not restricted by litter or vegetation and that heating/cooling coils are clean.

d) Wash, dry and replace or renew air filters as appropriate.

e) Check that the temperature settings are correct

f) Check that condensate pan and drain are clear and properly attached.

g) Check for any undue noise or vibration from rotating components.


Edition : 4
File Size : 1 file , 48 KB
Number of Pages : 4
Published : 09/03/2011

History


Related products

NR RT/E/WI/27068 ISSUE 1
Published Date: 12/04/2004
Maintenance of 25 KV GEC Type OX Sf6 Insulated Vacuum Switchgear Incorporating Sequential Isolators & Associated Equipment (aka NR/WI/ELP/27068)
$18.6
NR NR/L3/MTC/RCS0216/GHE01 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Environmental - Invasive & Injurious Plants
$5.7
NR NR/CIV/SD/FORMB/350 ISSUE P2
Published Date: 08/05/2006
Form B: Civils Associated Drainage
$7.5
NR BRS-SE 82/10 ISSUE B
Published Date: 02/26/1980
Level Crossing Warning Arrangements Mounting Screw for Miniature Red/Green Signal Unit
$5.7

Best-Selling Products

Thermodynamics Properties of Cryogenic Fluids
Published Date: 03/01/1997
$45.6