NR NR/GN/ELP/27415 ISSUE 1 PDF

NR NR/GN/ELP/27415 ISSUE 1 PDF

Name:
NR NR/GN/ELP/27415 ISSUE 1 PDF

Published Date:
12/05/2015

Status:
[ Active ]

Description:

Calculation and Analysis of Overhead Contact System Geometry

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-gn-elp-27415-issue-1_2776110

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

This Guidance Note covers the following aspects of Overhead Contact System geometry analysis: 

  • When analysis is required;  
  • Parameters required to perform analysis;  
  • Format and sign convention for Height and Stagger analysis;  
  • Parameters that require calculation;  
  • Procedure for analysis.

This Guidance Note applies to all persons responsible for undertaking analysis of Overhead Contact System Geometry on Overhead Line Equipment.

The calculations and princples contained within this document are applicable to all Overhead Contact System designs currently in use on Network Rail controlled infrastructure.

Purpose

This Guidance Note describes the basic Overhead Contact System geometry calculations that are required to demonstrate compliance to the Company Standard NR/L2/ELP/21087Specification of Maintenance of 25kV Overhead LineElectrification Equipment.


Edition : 1
File Size : 1 file , 310 KB
Number of Pages : 16
Published : 12/05/2015

History


Related products

NR NR/L3/MTC/RCS0216/MP03 ISSUE 3
Published Date: 06/03/2023
Risk Control Manual: On/Off and Cross Tracking of OTP
5.70 €
NR TWI 2P017 ISSUE 1
Published Date: 03/01/2005
How to Carry out Unclipping and Clipping up of Flat Bottom Rail
5.70 €
NR NR/L3/SIG/10064/GI/B002 ISSUE 4
Published Date: 06/04/2022
General Instructions to Staff Working on S&T Equipment: Disconnections - During Failures or to Work on S&T Equipment or the Release of Controls
13.20 €
NR X01400 ISSUE 2
Published Date: 02/06/1999
AHBC Typical Circuits Layout Double Line Bi-Directional with Separate ATC Strike-In
5.70 €

Best-Selling Products

CAN/CSA-CEI/IEC 1000-1-1-97 (R2023)
Published Date: 01/18/2000
Electromagnetic Compatibility (EMC) - Part 1: General - Section 1: Application and Interpretation of Fundamental Definitions and Terms (Adopted CEI/IEC 1000-1-1:1992)
37.80 €
CAN/CSA-CEI/IEC 1000-2-1-97 (R2023)
Published Date: 01/18/2000
Electromagnetic Compatibility (EMC) - Part 2: Environment - Section 1: Description of the Environment - Electromagnetic Environment for Low-Frequency Conducted Disturbances and Signalling in Public Power Supply Systems (Adopted CEI/IEC 1000- 2-1:1990) / Compatibilite electromagnetique (CEM) - Partie
36.30 €
CAN/CSA-CEI/IEC 1160-96 (R2001)
Published Date: 05/03/2000
Formal Design Review (Adopted CEI/IEC 1160:1992) / Revue de conception formalisee (norme CEI/IEC 1160:1992 adoptee)
31.50 €
CAN/CSA-CEI/IEC 1258-98 (R2002)
Published Date: 02/25/2000
Guidelines for the Development and Use of Medical Electrical Equipment Educational Materials (Adopted CEI/IEC 1258:1994, first edition) / Guide pour le developpement et l'utilisation des supports educatifs relatifs aux appareils electromedicaux (norme CEI/IEC 1258:1994 adoptee, premiere edition) **
CAN/CSA-CEI/IEC 1288-1-98 (R2012)
Published Date: 02/16/2000
Cardiac Defibrillators - Cardiac Defibrillators-Monitors - Part 1: Operation (Adopted CEI/IEC 1288-1:1993, first edition) / Defibrillateurs cardiaques - Moniteurs-defibrillateurs cardiaques - Partie 1: Fonctionnement (norme CEI/IEC 1288-1:1993 adoptee, premiere edition)
CAN/CSA-CEI/IEC 1288-2-98 (R2012)
Published Date: 02/16/2000
Cardiac Defibrillators - Cardiac Defibrillators-Monitors - Part 2: Maintenance (Adopted CEI/IEC 1288-2:1993, first edition) / Defibrillateurs cardiaques - Moniteurs-defibrillateurs cardiaques - Partie 2: Maintenance (norme CEI/IEC 1288-2:1993 adoptee, premiere edition)