NR NR/GN/RMVP/27700 ISSUE 1 PDF

NR NR/GN/RMVP/27700 ISSUE 1 PDF

Name:
NR NR/GN/RMVP/27700 ISSUE 1 PDF

Published Date:
06/03/2017

Status:
[ Not for New Design ]

Description:

Plant Product Introduction Process - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

Traction and Rolling Stock (T&RS) products are not within the scope of this guidance note.

NOTE 1: Introduction of T&RS products is covered by NR/L2/RSE/100/04.

All other products within the remit of the Professional Head of are within the scope of this guidance note.

NOTE 2: See NR/L1/RMVP/0001 for guidance on products within scope.

NOTE 3: Plant products attached to T&RS products are within scope.

The product introduction process covers all aspects of the product lifecycle.

The process applies from the commencement of projects concerning the specification, procurement or modification of products.

This guidance note might also represent good practice for the introduction of other product types.

Purpose

The purpose of this guidance note is to:

a) provide best practice for capturing and delivering the required function and purpose of plant products;

b) indicate where to find the relevant standards, controls and processes required for compliant and effective introduction of plant products; and

c) provide reference to additional information sources that might support the development of further best practice


Edition : 1
File Size : 2 files , 1.3 MB
Number of Pages : 28
Published : 06/03/2017

History


Related products

NR NR/L2/TEL/30135 ISSUE 6
Published Date: 09/04/2021
Video Surveillance Systems (VSS)
$18.6
NR NR/L2/SIG/11201/MOD A2-17 ISSUE 1
Published Date: 06/02/2018
Signalling Design Handbook: Risk Assessments & Safety System
$13.2
NR BRS-SC 35
Published Date: 06/26/1974
Cable Troughing - Trough Straight Half Length 350x130
$5.7
NR T34040 ISSUE 2
Published Date: 02/02/2002
Lineside & on Track Equipment Typical Circuits Points - TPWS Proving and Indication Circuits for Retro-Fitment to Relay Operated Signalling
$5.7

Best-Selling Products