NR NR/GN/RMVP/27702 ISSUE 2 PDF

NR NR/GN/RMVP/27702 ISSUE 2 PDF

Name:
NR NR/GN/RMVP/27702 ISSUE 2 PDF

Published Date:
03/03/2018

Status:
[ Revised ]

Description:

Plant Product Acceptance Process

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This guidance note describes how the designated Plant Engineering Lead Reviewer applies the plant product acceptance requirements checklist to assess and recommend an item of plant and equipment for acceptance and use on Network Rail managed infrastructure (NRMI).

NR/L2/RSE/100/05 provides information on the process for product acceptance and change to Network Rail controlled infrastructure. Links to guidance on categories of typically controlled products are included on the NR Product Acceptance web page and also the Product Acceptance application form. This guidance note provides the further information required to enable a Plant Engineering Lead Reviewer to undertake the assessment of an item of plant for product acceptance.

NR/GN/RMVP/27700 provides guidance and information on specifications, relevant standards and controls that projects need to take into account from the beginning of a project. A review of this process should be undertaken by prospective applicants prior to application for plant product acceptance.

This document covers product acceptance requirements for the following plant types used on NRMI:

a) on-track machines (OTM), in working and travelling mode within an engineering possession;

b) on-track plant (OTP) and demountable machines, in working and travelling mode within an engineering possession; and

c) portable and transportable mobile plant (PTMP), both railborne and non-rail borne used on a worksite or within an engineering possession.

Purpose

The implementation of this guidance note helps to:

a) provide a systematic, structured and robust assessment of risks associated with hazards during product acceptance of railborne plant in line with the common safety method on risk evaluation and assessment (CSM-RA) as set out in the Network Rail standard NR/L2/RSE/100/02.

Note: Where an alternative risk assessment approach is employed, this should adopt the principles of CSM.

b) confirm the safety requirements necessary to mitigate risks to an acceptable level i.e. as low as reasonably practicable or so far as is reasonably practicable, have been determined, complied with and safety measures put in place, to reduce the risk of in-service incidents/accidents.


Edition : 2
File Size : 1 file , 660 KB
Number of Pages : 26
Published : 03/03/2018

History

NR NR/GN/RMVP/27702 ISSUE 3
Published Date: 03/05/2022
Plant Product Acceptance Process
$13.2
NR NR/GN/RMVP/27702 ISSUE 2
Published Date: 03/03/2018
Plant Product Acceptance Process
$18.6

Related products

NR NR/L3/SIG/10064/GI/E001 ISSUE 3
Published Date: 09/04/2021
General Instructions to Staff Working on S&T Equipment: Electrical Interference
$13.2
NR T28435 ISSUE 2
Published Date: 06/05/1999
Lineside & on Track Equipment Typical Circuits Signal & Indicators "Off" Indicator Lighting Circuit
$5.7
NR RT/CE/S/085 ISSUE 1
Published Date: 04/01/2004
Examination of Tunnels (aka NR/SP/CIV/085 or NR/L2/CIV/085)
$24.3
NR TWI 2P025 ISSUE 1
Published Date: 03/01/2005
How to Recognise Plain Line Joint Defects
$5.7

Best-Selling Products