NR NR/GN/RSC/01303 ISSUE 2 PDF

NR NR/GN/RSC/01303 ISSUE 2 PDF

Name:
NR NR/GN/RSC/01303 ISSUE 2 PDF

Published Date:
06/04/2005

Status:
[ Withdrawn ]

Description:

Guidance for the Issue of Certificates of Authority when the Train Operating Company Changes (aka NR/GN/RSE/01303)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

This Guidance Note applies to those circumstances where a change of vehicle Operator occurs, but no change to the vehicles, or the route(s) over which they operate. (Where a vehicle change occurs the provisions of GE /RT 8270 shall be applied).

It does not apply to instances of Plant Operator who only operates such equipment within a possession.

The existing commercial processes (e.g. track access and vehicle change) are unaffected by these arrangements.

Purpose

Recently there have been a number of instances when the operators of vehicles with RSAB Certificates of Authority to Operate (CoAs) have changed. This is significant because CoAs are usually issued to a specific, named, operator. These changes are likely to occur more frequently as the SRA implements its policy of franchise restructuring and consolidation.

This Guidance Note identifies those issues that need to be addressed before a CoA may be issued to a new Operator. In particular, it discusses the principles involved, the need for clarity between the Network Rail route acceptance and Railway Safety Case (RSC) review processes, the different scenarios in which changes occur and the information required by Network Rail before a new certificate can be issued.

The principles within this paper have been endorsed by RSAB on 10.03.04.


Edition : 2
File Size : 1 file , 260 KB
Number of Pages : 12
Published : 06/04/2005

History


Related products

NR NR/L3/OPS/045/3.37 ISSUE 1
Published Date: 06/01/2019
National Operating Procedure (NOP) 3.37: Operational Workload Assessment
$7.5
NR NB 006 ISSUE 1
Published Date: 10/01/2003
Track Circuit Tal Cables: Disconnection Box to Rails Arrangement
$5.7
NR NB 038 ISSUE 1
Published Date: 01/01/2005
WRSL 2MHz SSI Start Up Procedure
$5.7
NR NR/L2/TRK/001 ISSUE 24
Published Date: 03/02/2024
Inspection and Maintenance of Permanent Way
$13.2

Best-Selling Products