NR NR/L3/OPS/045/3.37 ISSUE 1 PDF

NR NR/L3/OPS/045/3.37 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/3.37 ISSUE 1 PDF

Published Date:
06/01/2019

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 3.37: Operational Workload Assessment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This procedure applies to managers who are responsible for operational locations. This process covers any role responsible for the supervision or operation of signalling equipment, level crossing equipment and electrical control equipment. 

Requests for updated job evaluation or operational grade changes are not within the scope of this procedure.  

PURPOSE

The purpose of this standard is to effectively manage the risk of operator error due to workload arising from changes in operational demand. This will be delivered through a consistent set of criteria to conduct an appropriate workload assessment.


Edition : 1
File Size : 1 file , 330 KB
Number of Pages : 7
Published : 06/01/2019

History


Related products

NR X74440 ISSUE 1
Published Date: 03/03/2012
MCB-OC(RTL) TYPICAL CIRCUITS VALVE & MOTOR CONTROL CIRCUITS
$5.7
NR NR/GN/TEL/10117 ISSUE 2
Published Date: 02/01/2006
Competence Management Systems for Work on Control & Communication Systems
$18.6
NR E10000/11/8 ISSUE D
Published Date:
Track Circuits - Relationship of Audio Frequency Track Circuit Equipment to Signals and Other Track Types
$5.7
NR BRS-SM 2315
Published Date: 02/14/1994
Backdrive & Detection Swing Nose Crossing General Assembly
$5.7

Best-Selling Products