NR NR/L1/ELP/27000 ISSUE 2 PDF

NR NR/L1/ELP/27000 ISSUE 2 PDF

Name:
NR NR/L1/ELP/27000 ISSUE 2 PDF

Published Date:
03/04/2017

Status:
[ Revised ]

Description:

Policy Requirements for Electrical Power Assets

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$52.2
Need Help?
PDF ONLY

This standard applies to the asset management of all EP assets. Certain clauses also apply to the introduction of new EP assets to the rail network

Purpose

The purpose of the electrical power (EP) asset policy within Network Rail is to provide reliable and safe operation of the network to:

• Provide for the safety of employees, contractors, users of the infrastructure and third parties,

• Meet and maintain statutory obligations,

• Optimise the life and performance of assets and the network,

• Maintain quality of service by minimising disruption to customers.

This standard contains the specific requirements that enable the objectives set out above to be met. Prior to issue as this standard, the requirements were set out in Annex 1 – Policy implementation requirements and guidelines (December 2012) to the Electrical Power Asset Policy. This standard now supersedes that document and any requirements set out in NR/L1/ELP/27000 issue 1.


Edition : 2
File Size : 1 file , 3.6 MB
Number of Pages : 215
Published : 03/04/2017

History

NR NR/L1/ELP/27000 ISSUE 4
Published Date: 06/05/2021
Policy Requirements for Electrical Power Assets
$24.3
NR NR/L1/ELP/27000 ISSUE 3
Published Date: 12/05/2020
Policy Requirements for Electrical Power Assets
$24.3
NR NR/L1/ELP/27000 ISSUE 2
Published Date: 03/04/2017
Policy Requirements for Electrical Power Assets
$52.2

Related products

NR RT/CE/PWSI/004 ISSUE 3
Published Date: 09/22/2003
Instruction on the Management of Rails to Control Rolling Contact Fatigue (Gauge Corner Cracking & Head Checking) & Addendum
$24.3
NR NR/L3/SIG/10064/GI/U001 ISSUE 3
Published Date: 09/04/2021
General Instructions to Staff Working on S&T Equipment: Tools, Measuring Instruments and Calibration
$5.7
NR NR/L3/OHS/005/13/F01 ISSUE 1
Published Date: 03/05/2022
Design and Construction Management in a High Street Environment: Station Retail Unit Refit (Not on Platform)
$5.7
NR NR/L2/SIG/11201/MOD A2-10 ISSUE 1
Published Date: 06/02/2018
Signalling Design Handbook: Signalling Design Production Process
$13.2

Best-Selling Products