NR RT/CE/PWSI/004 ISSUE 3 PDF

NR RT/CE/PWSI/004 ISSUE 3 PDF

Name:
NR RT/CE/PWSI/004 ISSUE 3 PDF

Published Date:
09/22/2003

Status:
[ Inactive ]

Description:

Instruction on the Management of Rails to Control Rolling Contact Fatigue (Gauge Corner Cracking & Head Checking) & Addendum

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
INACTIVE * PDF ONLY

Introduction

A Glossary of terms and abbreviations used in this document is contained in Appendix A.

This instruction contains changes to previous requirements. These result from increased knowledge on the types of RCF, advice from world experts and analysis of data. This instruction contains changes with respect to the scope and frequency of inspection of RCF sites affected by rolling contact fatigue and the use of grinding as a routine method for the control of RCF.

This instruction contains new guidance on the use of the Sperry, RSU, roller search unit and the minimum actions that need to be applied if a flaw is discovered following U15 testing.

Additional information and guidance including photographs of types and categories of Rolling Contact Fatigue (RCF) can be found in RT/PWG/001, February 2001.


Edition : 3
File Size : 1 file , 440 KB
Number of Pages : 66
Published : 09/22/2003

History


Related products

NR BRS-SM 62
Published Date: 06/07/1974
Colour Light Signals Bracket Assembly for Position Light Signals on Posts 140 Diameter & 168 Diameter
$5.7
NR SSIDIS206 ISSUE 1
Published Date: 09/01/2018
Simplified Swinging Overlap Data
$13.2
NR NR/L3/ELP/27232 ISSUE 2
Published Date: 08/26/2008
Work Instruction for Defect Reporting
$7.5
NR TPWS/TGN/003 ISSUE 4
Published Date: 10/01/2002
TPWS Suppression and Complex Approaches
$18.6

Best-Selling Products

Nanomedicine : Basic Capabilities
Published Date: 10/01/1999
$29.7