NR NR/L1/SIG/50021/03 ISSUE 1 PDF

NR NR/L1/SIG/50021/03 ISSUE 1 PDF

Name:
NR NR/L1/SIG/50021/03 ISSUE 1 PDF

Published Date:
06/04/2016

Status:
[ Active ]

Description:

Signalling Asset Policy: Maintenance

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module describes the strategy for conducting maintenance on CCS systems and includes:

  • Planned Inspections 

  • Planned Preventative Maintenance 

  • Corrective Maintenance Activities

It includes maintenance of active level crossing assets maintained by signalling technicians, but excludes maintenance and inspection of other level crossing assets (e.g. Level Crossing Managers¡¦ Inspections).

This module applies to Route Asset Management (RAM) and Network Operations Maintenance teams responsible for managing and delivering signalling maintenance activities. It also applies to infrastructure projects when introducing or modifying CCS equipment on the network.

Purpose

The purpose of this module is to describe the ongoing strategy for undertaking maintenance on Control, Command and Signalling (CCS) systems for control period (CP) 6 and beyond.


Edition : 1
File Size : 1 file , 190 KB
Number of Pages : 18
Published : 06/04/2016

History


Related products

NR NR/L3/MTC/RCS0216/TK45 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Rail Mounted Lubricators & Cold Bolt hole Expansion
$5.7
NR NR/CIV/SD/1811 ISSUE D
Published Date: 09/02/2017
Underbridge Ancillaries: Two Track Cill Units General Arrangement: Type 1
$5.7
NR NR/SP/SIG/50012 ISSUE 2
Published Date: 04/01/2006
Methodology for the Demonstration of Compatibility with TPWS Track Sub-System
$18.6
NR NR/L3/SIG/SG0065 ISSUE 2
Published Date: 08/26/2008
Management of Disconnections that Affect Signalling Equipment
$13.2

Best-Selling Products

281491 37798
Published Date:
Chemical Resistance Guide for Elastomers IV