NR NR/L3/SIG/SG0065 ISSUE 2 PDF

NR NR/L3/SIG/SG0065 ISSUE 2 PDF

Name:
NR NR/L3/SIG/SG0065 ISSUE 2 PDF

Published Date:
08/26/2008

Status:
[ Active ]

Description:

Management of Disconnections that Affect Signalling Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This procedure covers disconnections to signalling equipment carried out by Network Rail maintenance; it does not cover disconnections associated with new works or major renewals.

This procedure does not cover personal safety requirements.

All maintenance signalling disconnections are covered except for axle counters systems (covered in NR/L3/SIG/SG0155)

Individual role/position responsibilities for this procedure are detailed in the RACI.

Purpose

This procedure details the roles and responsibilities for the disconnection of signalling equipment for preventative or corrective maintenance, minor renewals, or safety that will or may affect the normal running of trains.


Edition : 2
File Size : 1 file , 610 KB
Number of Pages : 11
Published : 08/26/2008

History


Related products

NR NR/L2/SIG/50035 ISSUE 5
Published Date: 12/03/2022
Competence Standard - Competence and Training in Signal and Level Crossing Engineering
$18.6
NR NR/SP/ELP/27044 ISSUE 2
Published Date: 04/01/2006
Allocation of Designations for Switching Stations, Auxiliary Supply Points, Electrical Sections, Overhead Line Switches, Circuit Breakers and the Like, for a.c. Electrified Lines (aka NR/GN/ELP/27044)
$13.2
NR NR/L2/TRK/3038/01 ISSUE 2
Published Date: 12/02/2023
Longitudinal Bearer Systems - Inspection, Maintenance and Design: Definitions, Types and Responsibilities Associated with Longitudinal Bearer Systems
$13.2

Best-Selling Products

NBS TN-1079
Published Date: 1985
Tables of Industrial Gas Container Contents and Density for Oxygen, Argon, Nitrogen, Helium, and Hydrogen
$10.8