NR NR/L2/ADG/002/11 ISSUE 1 PDF

NR NR/L2/ADG/002/11 ISSUE 1 PDF

Name:
NR NR/L2/ADG/002/11 ISSUE 1 PDF

Published Date:
12/03/2016

Status:
[ Active ]

Description:

Asset Data Governance Framework Manual: Data Processing - Maintenance

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module specifies the process by which asset-related data and information requirements are delivered through data collection, maintenance and management activities through data improvement projects, enhancements, renewals, refurbishment, and maintenance activities on physical assets and data solutions.

This module applies to:

a) the entire asset management capability as defined within Network Rail’s asset management strategy, both internal and external to Network Rail throughout the lifecycle of asset data;

b) the delivery of requests and requirements for asset-related data from those individuals and organisations external to the asset management system e.g. asset data used in financial calculations; and

c) projects delivering asset-data related applications and solutions to define and agree asset data specifications and appropriate measures of quality.

It does not apply to non-operational assets such as IT and office facilities assets.

This module applies when:

a) delivering asset data required to comply with Network Rail asset standards and regulatory requirements;

b) delivering required asset-related information needed for business planning, in financial processes, asset management, and asset maintenance planning;

c) receiving asset information from a project or works

Purpose

This module establishes the Data Processing process to:

a) collect, maintain and present asset-related data (for use);

b) confirm data conforms to specifications upon entry and storage;

c) assess the impact of changes to specifications and quality requirements of existing data maintained in registers and data stores;

d) trace data collection and storage requirements to and from business objectives, strategy and information needs to determine what data should be collected and whether it is fit for purpose.

It supports Network Rail in realising the change management principles in NR/L1/ADG/001 that set out how Network Rail defines and applies measures of quality to asset-related data to establish whether the data set is fit for purpose to:

a) align with information security, legal and regulatory requirements; and

b) when collecting, maintaining, and disposing (archiving) of data in manner which can be traceable to and from the information and reporting requirements.

The process in this module mitigates the asset-data related hazard ‘structural inability to process data or refine data’.

This module forms part of the quality management system for asset-related data, which interfaces with these processes and the related management systems (nonexclusively) for Cyber and Information Security.


Edition : 1
File Size : 1 file , 340 KB
Number of Pages : 7
Published : 12/03/2016

History


Related products

NR NR/L3/TRK/2049/MOD02 ISSUE 1
Published Date: 03/05/2016
Track Design Handbook: Mathematics
$18.6
NR NR/SIN/108 ISSUE 1
Published Date: 07/01/2010
Inspection of Level Crossing Surface Systems on Sharp Curves and/or with High Skew
$7.5
NR NR/CIV/SD/16M/100 ISSUE D
Published Date: 06/01/2019
Non-Station Footbridges up to 16m (100 series): General Notes
$5.7
NR NR/L3/SIG/10064/GI/E054 ISSUE 3
Published Date: 09/04/2021
General Instructions to Staff Working on S&T Equipment: Securing Points Out of Use
$5.7

Best-Selling Products

PCI 126-15
Published Date: 2015
Manual for the Design of Hollow Core Slabs and Walls
Free Download
PCI 128-19
Published Date: 2019
Specification for Glass-Fiber-Reinforced Concrete Panels
$39.6
PCI 142-24
Published Date: 2024
Specification for Precast, Prestressed Concrete Piles
$39.6
PCI 150-24
Published Date: 2024
Specification for the Design of Precast Concrete Insulated Wall Panels
$39.6
PCI BM-20
Published Date: 2004
Precast Prestressed Concrete Piles - Chapter 20, Bridge Design Manual, Sept. 2004, 1st Edition
$3.3
PCI CB-02-16
Published Date: 2016
Recommended Practice for Lateral Stability of Precast, Prestressed Concrete Bridge Girders
$36.3