NR NR/SIN/108 ISSUE 1 PDF

NR NR/SIN/108 ISSUE 1 PDF

Name:
NR NR/SIN/108 ISSUE 1 PDF

Published Date:
07/01/2010

Status:
[ Withdrawn ]

Description:

Inspection of Level Crossing Surface Systems on Sharp Curves and/or with High Skew

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
W/D * PDF ONLY

Conditions requiring additional inspection

This SIN shall apply to all level crossings with either or both of the following characteristics:

1. Radius of track curvature is less than 400 metres

2. The acute angle between the road and railway centre line is less than 60o

Background and purpose

Following the derailment at Croxton level crossing on 12th September 2006 and investigation of the causes, there is a need to carry out additional inspections of level crossing surface systems on sharp curves and/or with high skew, and document the results.

 


Edition : 1
File Size : 1 file , 140 KB
Number of Pages : 9
Published : 07/01/2010

History


Related products

NR NR/L3/SIG/11761/C020 ISSUE 4
Published Date: 06/04/2015
EBI Track 200/300/400 Track Circuits - Guidance Notes for Traction Bonding
$18.6
NR RT/ETE/3/A/10
Published Date: 03/17/1998
Arrangement of Track Cable Entry Into Substations and Track Paralleling Huts
$5.7
NR NR/L3/MTC/RCS0216/SIG04 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Working on Train Protection Equipment
$5.7
NR SAO-IEC-HT-16 ISSUE 5
Published Date: 10/29/1999
Integrated Electronic Control Centre Technical Handbook IECC 6001 Node Configuration
$13.2

Best-Selling Products

HIMSS/NEMA HN 1-2008
Published Date:
Manufacturer Disclosure Statement for Medical Device Security
HIMSS/NEMA HN 1-2013
Published Date: 11/01/2013
Manufacturer Disclosure Statement for Medical Device Security
Free Download