NR NR/L2/ADG/003 ISSUE 1 PDF

NR NR/L2/ADG/003 ISSUE 1 PDF

Name:
NR NR/L2/ADG/003 ISSUE 1 PDF

Published Date:
12/03/2016

Status:
[ Inactive ]

Description:

Asset Data Exchange Plan

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
INACTIVE * PDF ONLY

This business process specifies the process to exchange asset-related data between Routes, Delivery Agents, Custodians of Asset Data and the Supply Chain during projects or works.

This business process applies when:

a) exchanging asset–related data at pre-determined points during a project lifecycle, including the initiation or completion of the project or works, to be input into asset registers, document repositories, asset management systems and geospatial information systems;

b) defining accountabilities and responsibilities for steps in the exchange of asset–related data.

This business process applies to any planned or unplanned activity, project or works that:

a) changes network capability; or

b) refurbishes, renews or enhances Network Rail infrastructure assets

This business process does not apply to maintenance activities that do not change, renew, enhance or remove assets.

Purpose

This business process provides a defined, controlled method to:

a) enable asset-related data to be exchanged in an efficient, controlled manner;

b) improve the accuracy, frequency and reusability of asset-related data received from projects of works which refurbishes, renews or enhances assets This business process enables the business to better manage the risks associated with:

a) making decisions based on asset-related data b) not being able to control project scope, time and cost.

It supports Network Rail in realising the change management principles in NR/L1/ADG/001 that set out how Network Rail defines and applies measures of quality to asset-related data. It is aligned to the Asset Management Strategy and Policy, and Network Rail’s vision for systematic management of assets.

This business process mitigates the asset-data related hazard of incompatibility of design elements and data collected through projects with business process.

 


Edition : 1
File Size : 1 file , 640 KB
Number of Pages : 17
Published : 12/03/2016

History


Related products

NR TWI 3G077 ISSUE 1
Published Date: 03/01/2005
How to Maintain Non-Ballasted Track
$5.7
NR NR/CIV/SD/4002 ISSUE A
Published Date: 03/07/2020
Station Footbridges: Staircase Reflected Ceiling Plan
$5.7
NR NR/L2/TRK/2102 ISSUE 12
Published Date: 06/03/2023
Design and Construction of Track
$35.4
NR X74390 ISSUE 1
Published Date: 03/03/2012
MCB-OC(RTL) TYPICAL CIRCUITS USER RAISE TAZR CIRCUITS
$5.7

Best-Selling Products

UL 1004-10
Published Date: 02/28/2020
Standard for Pool Pump Motors
$150.6
UL 1004-1
Published Date: 09/15/2008
Rotating Electrical Machines - General Requirements
UL 1004-1
Published Date: 09/19/2012
Rotating Electrical Machines - General Requirements
$189.3
UL 1004-2
Published Date: 09/15/2008
Impedance Protected Motors
UL 1004-2
Published Date: 01/10/2014
Impedance Protected Motors
UL 1004-3
Published Date: 09/15/2008
Standard for Thermally Protected Motors