NR NR/L2/CIV/005/07 ISSUE 1 PDF

NR NR/L2/CIV/005/07 ISSUE 1 PDF

Name:
NR NR/L2/CIV/005/07 ISSUE 1 PDF

Published Date:
06/02/2018

Status:
[ Active ]

Description:

Drainage Systems Manual: Drainage Intervention

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module applies to all the functions that contribute to any phase of the drainage life cycle (for example asset management, maintenance, design, installation, inspection, etc.).

The capital investment intervention options described in this document are defined by the following standard jobs:

Drainage Asset Refurbish (standard job 009623)

Drainage Asset Renew (standard job 009622)

Drainage Asset New-Build (standard job 009624).

  • For life cycle activities, this document is to be read with the following documents:

  • NR/L2/CIV/005/04, Drainage Inspections

  • NR/L2/CIV/005/05, Design Survey

  • NR/L2/CIV/005/08, Drainage Assessment

  • NR/L2/CIV/005/09, Drainage Design

  • NR/L2/CIV/005/10, Drainage Installation 

  • NR/L2/CIV/005/11, Drainage Maintenance

Purpose

This module helps mitigate the risk of drainage system failure by describing the intervention options that can be considered for determining the life cycle activities required of the railway drainage systems.

This module forms part of the Drainage CIV/005 manual as shown in the process map in NR/L2/CIV/005, Drainage System Manual.


Edition : 1
File Size : 1 file , 480 KB
Number of Pages : 26
Published : 06/02/2018

History


Related products

NR NR/CIV/SD/1544 ISSUE C
Published Date: 12/03/2016
E-Type Underbridges: Cross Girder & Trimmer: Double Track Square Steel Floor End Trimmer
$5.7
NR NR/L2/OHS/019/01 ISSUE 2
Published Date: 06/03/2023
Safety of People at Work on or Near the Line: Module 01 - Planning and Working for Fault, Failure, and Incident Response
$7.5
NR NR/L3/ELP/27240/NR/DIST C22E ISSUE 2
Published Date: 03/01/2017
Routine Maintenance of 33kV Switchgear - Switchgear & Cowan Type K4
$5.7
NR NR/L3/OCS/096 ISSUE 2
Published Date: 06/06/2009
Low Rail Adhesion sites - Risk Assessment Process
$13.2

Best-Selling Products