NR NR/L2/CIV/086/MOD01 ISSUE 2 PDF

NR NR/L2/CIV/086/MOD01 ISSUE 2 PDF

Name:
NR NR/L2/CIV/086/MOD01 ISSUE 2 PDF

Published Date:
12/04/2021

Status:
[ Revised ]

Description:

Management of Earthworks Manual: Earthwork Evaluations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This document covers procedures for the set-up and outcomes of evaluations.

It applies to all earthworks within the Network Rail boundary and slopes outside the boundary that should affect Network Rail infrastructure.

This business process does not cover:

a) Health and safety requirements applicable to operational safety and emergency evacuation procedures;

b) The commercial and all the organisational responsibilities for delivering the requirements of the Standard. 

Purpose 

Evaluations are carried out when there is a need to appraise the stability or condition of earthworks and determine the actions required. 

This business process manages the control, ‘earthwork evaluation’, mitigating the following risks: 

a) loss of track support or track geometry; 

b) slope failure leading to loss of kinematic envelope and/or track geometry.


Edition : 2
File Size : 3 files , 2.2 MB
Number of Pages : 15
Published : 12/04/2021

History

NR NR/L2/CIV/086/MOD01 ISSUE 3
Published Date: 06/01/2024
Management of Earthworks Manual: Earthwork Evaluations
$13.2
NR NR/L2/CIV/086/MOD01 ISSUE 2
Published Date: 12/04/2021
Management of Earthworks Manual: Earthwork Evaluations
$13.2
NR NR/L2/CIV/086/MOD01 ISSUE 1
Published Date: 09/02/2017
Management of Earthworks Manual: Earthwork Evaluations
$13.2

Related products

NR NR/FP C300 ISSUE 4
Published Date: 09/03/2011
Plant & Equipment Work Instructions: Unmanned Lineside Building Services
$5.7
NR BRS-SM 633/1 ISSUE B
Published Date: 01/30/1990
Temporary Speed Restriction Warning Arrangements Side Plate for Fixed Clamp on NSM Magnet Support
$5.7
NR NR/SMTH/PART 08 ISSUE 4
Published Date: 12/02/2023
Signal Maintenance Testing Handbook (SMTH): Part 08
$35.4
NR T60099 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Indicators - Miniature Route Indicator (F.O.4 Indications) Acc: Relay Interface Peripheral Location Circuit
$5.7

Best-Selling Products