NR NR/L2/CIV/095 ISSUE 1 PDF

NR NR/L2/CIV/095 ISSUE 1 PDF

Name:
NR NR/L2/CIV/095 ISSUE 1 PDF

Published Date:
03/07/2020

Status:
[ Revised ]

Description:

Asset Protection and Optimisation Management of Third Party Works on Network Rail Infrastructure

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

A Third Party is an organization other than Network Rail intending to undertake works which will physically change or impact the operation, assets, design or other functionality of Network Rail’s infrastructure. The application of this business process is project specific, as agreed between the Head of Asset Protection and Sponsorship.

This business process sets out requirements for the application of Asset Protection controls to be established when Third Parties wish to specify, manage and/or deliver projects on Network Rail's Managed (or leased) Infrastructure.

This business process sets out Network Rail's accountabilities and responsibilities to discharge its duties as Infrastructure Manager.

It applies to Third Party works being undertaken where Network Rail is not the sole client, including the Asset Protection assurance of works being undertaken by a Third Party, to assets that will be taken over by Network Rail for operation and/or maintenance.

This business process supports NR/L1/CIV/094; National Asset Protection and Optimization (ASPRO) Delivery Framework.

This business process is to be read in conjunction with NR/L2/OHS/0047; Application of the Construction (Design and Management) Regulations to Network Rail Construction Projects.

Access to the Network, is governed by this business process, but all parties have a positive obligation to work with each other in a timely manner, prioritizing safety and placing passenger needs first.

This business process does not replace the Landlord Consent Process or Stations and/or Depot Change processes (see Station Access Conditions and Depot Access Conditions). It does not replace the requirements stated within the lease, letting conditions, and Access Conditions, to safely manage or authorize construction within the station or depot lease area.

This business process does not apply to Outside Party works.

NOTE: See NR/L2/OHS/005.

Purpose

The purpose of this business process is to support in the mitigation of potential risks imported to the Network Rail infrastructure by Third Party organisations when working on, near, over or under the infrastructure through the application of Asset Protection and Optimization (ASPRO) controls.

Potential risks can be imported to the railway infrastructure from a multitude of Third Party works including:

  • building a new station;

  • building new bridges;

  • works within the designated precautionary area of level crossings.


Edition : 1
File Size : 1 file , 1000 KB
Number of Pages : 39
Published : 03/07/2020

History

NR NR/L2/CIV/095 ISSUE 2
Published Date: 12/03/2022
Asset Protection and Optimisation Management of Third Party Works on Network Rail Infrastructure
$18.6
NR NR/L2/CIV/095 ISSUE 1
Published Date: 03/07/2020
Asset Protection and Optimisation Management of Third Party Works on Network Rail Infrastructure
$18.6

Related products

NR NR/L1/FIR/100 ISSUE 6
Published Date: 09/04/2010
Fire Safety Policy
$7.5
NR NR/CIV/SD/F003/520/ADD ISSUE A
Published Date: 09/02/2017
Lining Maintenance Repairs Form 003 Addendum
$18.6
NR NR/CIV/SD/1840 ISSUE D
Published Date: 09/02/2017
Underbridge Ancillaries: Lifting Bracket: Vertical Lift
$5.7
NR T25511 ISSUE 2
Published Date: 03/25/1998
Lineside & on Track Equipment Typical Circuits Points Power Points, Control & Detection Circuits (Clamp Lock Type), SSI
$5.7

Best-Selling Products

ASSE (Plumbing) 1001-2008
Published Date: 02/18/2008
Performance Requirements for Atmospheric Type Vacuum Breakers
$13.5
ASSE (Plumbing) 1001-2017
Published Date: 06/01/2017
Performance Requirements for Atmospheric Type Vacuum Breakers
$13.5
ASSE (Plumbing) 1001-2021
Published Date: 11/01/2021
Performance Requirements for Atmospheric Type Vacuum Breakers
$13.5
ASSE (Plumbing) 1002-2008
Published Date: 04/28/2008
Performance Requirements for Anti-Siphon Fill Valves for Water Closet Tanks
$13.5
ASSE (Plumbing) 1002-2020/ASME A112.1002-2020/CSA B125.12:20
Published Date: 04/01/2020
Anti-Siphon Fill Valves for Water Closet Tanks
$25.5
ASSE (Plumbing) 1003-2009
Published Date: 09/28/2009
Performance Requirements for Water Pressure Reducing Valves for Domestic Water Distribution Systems
$13.5