NR NR/L2/CIV/095 ISSUE 2 PDF

NR NR/L2/CIV/095 ISSUE 2 PDF

Name:
NR NR/L2/CIV/095 ISSUE 2 PDF

Published Date:
12/03/2022

Status:
[ Active ]

Description:

Asset Protection and Optimisation Management of Third Party Works on Network Rail Infrastructure

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

A Third Party is an organisation (other than Network Rail) intending to undertake works which will physically change or impact the operation, assets, design or other functionality of Network Rail’s infrastructure. The application of this business process will vary depending on the requirements of individual projects, this will be agreed between the Head of Asset Protection and the Network Rail Sponsor assigned on a project basis. This business process sets out requirements for the application of Asset Protection controls to be established when Third Parties wish to specify, manage and/or deliver projects on Network Rail's Managed (or leased) Infrastructure.

This business process sets out Network Rail's accountabilities and responsibilities to discharge its duties as Infrastructure Manager.

It applies to Third Party works being undertaken where Network Rail is not the sole client, including the Asset Protection assurance of works being undertaken by a Third Party, to assets that will be taken over by Network Rail for operation and/or maintenance.

This business process supports NR/L1/CIV/094 (National Asset Protection and Optimisation (ASPRO) Delivery Framework).

This business process is to be read in conjunction with NR/L2/OHS/0047 Managing Health and Safety in Construction (Application of the Construction (Design and Management) Regulations to Network Rail) and NR/L2/INF/02202 Records Management of Health and Safety Files.

Access to the Network is governed by this business process, but all parties have a positive obligation to work with each other in a timely manner, prioritising safety and placing passenger needs first.

This business process does not replace the Landlord Consent Process or Stations and/or Depot Change processes (see Station Access Conditions and Depot Access Conditions). It does not replace the requirements stated within the station or depot lease letting conditions, and Access Conditions, to safely manage or authorise construction within the station or depot lease area.

This business process does not apply to Outside Party works.

NOTE: See NR/L3/OHS/005, Design and Construction Management in a High Street Environment.

Purpose

The purpose of this business process is to support the mitigation of potential risks imported to the Network Rail infrastructure by Third Party organisations when working on, near, over or under the infrastructure, through the application of Asset Protection and Optimisation (ASPRO) controls.

Potential risks can be imported to the railway infrastructure from a multitude of Third Party works including:

• building a new station;

• building new bridges;

• works within the designated precautionary area of level crossings.


Edition : 2
File Size : 1 file , 2 MB
Number of Pages : 36
Published : 12/03/2022

History

NR NR/L2/CIV/095 ISSUE 2
Published Date: 12/03/2022
Asset Protection and Optimisation Management of Third Party Works on Network Rail Infrastructure
$18.6
NR NR/L2/CIV/095 ISSUE 1
Published Date: 03/07/2020
Asset Protection and Optimisation Management of Third Party Works on Network Rail Infrastructure
$18.6

Related products

NR NR/L3/SIG/11235/G210 ISSUE 2
Published Date: 09/07/2024
Signal Maintenance Testing Handbook: Production and Acceptance of G130 Test Plans, and Acceptance of Associated G120 Test Schedules
$13.2
NR BRS-SE 97 ISSUE E
Published Date: 08/03/1982
Position Light Subsidiary and Shunting Signals Inverted Toric Lens (92mm X 19mm Fl)
$5.7
NR BRS-SW 67-C5 ISSUE 5
Published Date: 12/04/2004
Ground Frames "Traffic" Type Protected by Semi Auto Signal(s) Ground Frames Circuits (2)
$5.7
NR BRS-SM 299 ISSUE B
Published Date: 04/10/1985
4 Way Channel Rodding Support (2 1/4 Rod Centres)
$5.7

Best-Selling Products

ICEA P-117-734-2016
Published Date: 02/23/2016
Ampacities For Single-Conductor Solid Dielectric Power Cable 15 kV Through 35 kV
$90
ICEA P-117-734-2022
Published Date: 07/06/2022
Ampacities For Single-Conductor Solid Dielectric Power Cable 15 kV Through 35 kV
$96
ICEA P-123-739-2018
Published Date: 01/18/2018
GUIDE TO ESTABLISH ELECTRICAL TEST METHODS FOR NON-CONDUCTING JACKET MATERIALS FOR POWER CABLES RATED 5 TO 500 KV
$22.5
ICEA P-124-736-2021
Published Date: 06/03/2021
Code Words for 600 Volt Underground Distribution Cables
$13.5
ICEA P-127-737-2021
Published Date: 06/03/2021
Code Words for Overhead Aluminum Covered Conductors and 600 Volt Overhead Cables
$13.5
ICEA P-136-726-2024
Published Date: 2024
Guide for Pellet Inspection Systems for Unfilled Power Cable Insulation Compound
$29.1