NR NR/L2/CIV/191/05 ISSUE 1 PDF

NR NR/L2/CIV/191/05 ISSUE 1 PDF

Name:
NR NR/L2/CIV/191/05 ISSUE 1 PDF

Published Date:
03/07/2020

Status:
[ Revised ]

Description:

Mining Manual: Managing the Risk from Mining in Design and Construction

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module applies to the provision of mining hazard information to inform:

1) Network Rail and Third Party construction projects (including enhancements, replacements, renewals, emergency and temporary works);

2) land purchase, sale or the granting of other land rights by Network Rail.

This module applies to Network Rail and non-Network Rail personnel involved in the sponsoring, remitting, design, design approval and taking into use of railway infrastructure.

This module does not cover the provision of mining hazard information to inform Outside Party works.

Purpose

This module manages the risks arising from abandoned and working mines in design and construction. It mitigates the risk of construction works being undertaken without consideration of their vulnerability to and potential impact on mining hazards. The main risk being the collapse of mineworkings resulting in ground movement (such as subsidence) which could impact on the safety or performance of the railway during the design life of the development.

This process is designed to help achieve compliance with The Construction (Design and Management) Regulations 2015.


Edition : 1
File Size : 1 file , 380 KB
Number of Pages : 18
Published : 03/07/2020

History

NR NR/L2/CIV/191/05 ISSUE 3
Published Date: 03/02/2024
Mining Manual: Managing the Risk from Mining in Design and Construction
$18.6
NR NR/L2/CIV/191/05 ISSUE 2
Published Date: 06/03/2023
Mining Manual: Managing the Risk from Mining in Design and Construction
$18.6
NR NR/L2/CIV/191/05 ISSUE 1
Published Date: 03/07/2020
Mining Manual: Managing the Risk from Mining in Design and Construction
$13.2

Related products

NR NR/CIV/SD/16M/102 ISSUE D
Published Date: 06/01/2019
Non-Station Footbridges up to 16m (100 series): Drainage Philosophy
$5.7
NR BRS-SM 440/G1 ISSUE C
Published Date: 08/05/1994
Signalling Equipment Framework Large TOP/BOT Relay Rail for Apparatus Cases and REB's
$5.7
NR E10000/11/2 ISSUE C
Published Date: 08/01/1991
Track Circuits Existing Low Voltage Type Modified for Detecting Lightweight Vehicles (Non-Immune)
$5.7
NR NR/L3/ELP/27720 ISSUE 1
Published Date: 09/03/2022
Test Before Touch for Overhead Line Equipment
$18.6

Best-Selling Products

AA 23
Published Date: 01/01/2002
Welding Aluminum: Theory and Practice, Fourth Edition, 2002
$27
AA 23
Published Date: 01/01/2002
Draft -- Welding Aluminum: Theory and Practice
AA AACP
Published Date: 01/01/2004
Aluminum Alloy Castings: Properties, Processes, and Applications, 2004
AA ADM-1
Published Date: 01/01/2005
Aluminum Design Manual, 2005
AA ADM-1
Published Date: 2010
Aluminum Design Manual, 2010 Edition
AA ADM-2020
Published Date: 2020
Aluminum Design Manual, 2020 Edition
$148.5