NR NR/L2/CIV/193 ISSUE 2 PDF

NR NR/L2/CIV/193 ISSUE 2 PDF

Name:
NR NR/L2/CIV/193 ISSUE 2 PDF

Published Date:
12/03/2022

Status:
[ Active ]

Description:

Standard Specification for New and Upgraded Lifts

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$35.4
Need Help?
PDF ONLY

This specification applies to all new lift installation, end-of-life renewal, mid-life renewal or modernisation projects.

This document provides:

a. performance and selection requirements for lift equipment;

b. a minimum standard of workmanship and construction;

c. continuity of design to limit maintenance variations to a practicable minimum, irrespective of the provider;

d. a focus on a whole-life business model;

e. a focus on the use of non-proprietary equipment;

f. a framework for compliance and therefore minimising onward liabilities.

This document applies to all engaged in activities connected to any aspect of the lift life cycle.

Purpose 

The purpose of this specification is to provide a recognised methodology and standardised approach for the installation of new lifts or refurbishing existing lifts and/or replacement of life expired lifts. 

This specification will mitigate short term value engineered or proprietary lift equipment being used and maximise capital investment whilst minimising maintenance liabilities. It will further mitigate impact upon passengers by specifying robust and reliable Lift asset systems, and target safety-by-design for end users to remove known hazards or reduce risk. 

It gives Network Rail maximum access to the lift maintenance market by having lifts that can be maintained by any competent lift engineer, irrespective of who employs them.


Edition : 2
File Size : 1 file , 12 MB
Number of Pages : 151
Published : 12/03/2022

History

NR NR/L2/CIV/193 ISSUE 2
Published Date: 12/03/2022
Standard Specification for New and Upgraded Lifts
$35.4
NR NR/L2/CIV/193 ISSUE 1
Published Date: 12/07/2019
Standard Specification for New and Upgraded Lifts
$35.4

Related products

NR NR/L3/SIG/10665 ISSUE 23
Published Date: 06/03/2023
Reliability Centred Maintenance of Signalling Equipment
$24.3
NR RT/E/S/21011 ISSUE 1
Published Date: 02/01/1998
Data Communications Circuits Associated with Point-to-Point Equipment Used on Electrical Distribution Systems
$7.5
NR BRS-SM 2470
Published Date: 01/30/1995
Connection Rod Jaw End to 1 1/4" Screwed End, 67 Downset, 44 LH Offset
$5.7
NR NR/L3/OHS/005/08/F01 ISSUE 1
Published Date: 03/05/2022
Design and Construction Management in a High Street Environment: Electric Vehicle Charging Point Installed in Car Park - Diagram
$5.7

Best-Selling Products

Tracing EMFs in Building Wiring & Grounding
Published Date: 04/01/1995
$8.4