NR NR/L2/CPR/302 ISSUE 2 PDF

NR NR/L2/CPR/302 ISSUE 2 PDF

Name:
NR NR/L2/CPR/302 ISSUE 2 PDF

Published Date:
09/03/2011

Status:
[ Withdrawn ]

Description:

Supplier Qualification - Core Requirements

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
W/D * PDF ONLY

Applies to:

• suppliers registered with Link-up who have triggered an audit due to product code selection and/or have otherwise indicated that they work or intend to work on Network Rail Managed Infrastructure;

• sponsors of Sentinel scheme card holders;

• suppliers prioritised by Network Rail as:

a) ‘Principal Contractors' – who may be, or are, working on Network Rail Managed Infrastructure as Principal Contractor;

b) ‘Rail Plant Operating Company in Possessions' – those organisations operating rail (on-track) plant only in engineering possessions on Network Rail Managed Infrastructure.

NOTE 1 – This standard is a supplier qualification requirement independent of any specific current tendering or contract-specific requirements. A supplier may be assessed against the requirements contained in Clause 6 at any reasonable time irrespective of the contractual status of the supplier. GRIP stage exclusions do not apply. Sourcing and contract management teams should satisfy themselves that timely and appropriate contract-specific supplier assurance and safety management arrangements apply independently of the qualification requirements contained in this standard.

Purpose

This document sets out the core management system and management process requirements for suppliers of products and services that import risk onto Network Rail Managed Infrastructure.


Edition : 2
File Size : 1 file , 380 KB
Number of Pages : 28
Published : 09/03/2011

History


Related products

NR NR/L3/MTC/ME0300/09 ISSUE 1
Published Date: 06/04/2022
Mobile Maintenance Train Operational Procedures: Preparation of MMT, Handover and Hand-Back of Control of the MMT
$7.5
NR BRS-SE 168
Published Date: 02/03/1979
Position Light Signals Lens Conversion Kit WB&SCO Westlyte Signal E12423
$5.7
NR SAO-IEC-UG-1 ISSUE 2
Published Date: 10/29/1999
Retrofitting Rack Mounted Nodes
$13.2
NR NR/L3/MTC/RCS0216/MP25 ISSUE 3
Published Date: 12/02/2023
Risk Control Manual: Use of Rail Croppers for Scrap Rail Recovery
$5.7

Best-Selling Products

UNE-IEC/TR 60865-2:2006 IN
Published Date: 04/26/2006
Short-circuit currents - Calculation of effects - Part 2: Examples of calculation.
UNE-IEC/TR 60893-4:2005
Published Date: 02/09/2005
Insulating materials - Industrial rigid laminated sheets based on thermosetting resins for electrical purposes - Part 4: Typical values
UNE-IEC/TR 60909-2:2010 IN
Published Date: 02/17/2010
Short-circuit currents in three-phase a.c. systems - Part 2: Data of electrical equipment for short-circuit current calculations.
UNE-IEC/TR 61000-2-8:2006 IN
Published Date: 06/28/2006
Electromagnetic compatibility (EMC) - Part 2-8: Environment - Voltage dips and short interruptions on public electric power supply systems with statistical measurement results (IEC/TR 61000-2-8:2002)
UNE-IEC/TR 61000-3-6:2006 IN
Published Date: 07/19/2006
Electromagnetic compatibility (EMC) - Part 3: Limits - Section 6: Assessment of emission limits for distorting loads in MV and HV power systems - Basic EMC publication (IEC/TR 61000-3-6:1996)
UNE-IEC/TR 61010-3:2006 IN
Published Date: 03/15/2006
Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 3: Protocol for the preparation of conformity verification reports for the IEC 61010 2nd edition series .