NR NR/L3/MTC/ME0300/09 ISSUE 1 PDF

NR NR/L3/MTC/ME0300/09 ISSUE 1 PDF

Name:
NR NR/L3/MTC/ME0300/09 ISSUE 1 PDF

Published Date:
06/04/2022

Status:
[ Active ]

Description:

Mobile Maintenance Train Operational Procedures: Preparation of MMT, Handover and Hand-Back of Control of the MMT

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This procedure applies to all the MMTs owned and operated by Network Rail Infrastructure Maintenance (IM) and all Network Rail staff. The procedure works in collaboration with applicable standards of any Railway Undertaking (RU) contracted to operate the MMT. This module applies if the MMT will be working in a possession, protection zone or a Working in Section (WiS) shift.

It covers:

a) confirmation that train is ready to depart from the stabling point;

b) transit movements from the stabling point to the site;

c) handover between RU MMT driver and Network Rail PIC;

d) completion of work activity and preparation of train for transit movement;

e) hand-back between Network Rail PIC to RU MMT driver; and

f) close down of the train at the stabling point.

Purpose

This module standardises the handover of control of the MMT during the various stages of a shift; specifying who carries out which activities throughout the shift. It provides a standardised handover and hand-back process of the A50 control desk in the Mobile Maintenance Unit (MMU).


Edition : 1
File Size : 1 file , 210 KB
Number of Pages : 10
Published : 06/04/2022

History


Related products

NR NR/L2/SIG/11752/PART D ISSUE 2
Published Date: 08/01/2001
Train Detection Handbook Part D: Axle Counter Configuration Parameters
$5.7
NR BRS-SM 55/1 ISSUE B
Published Date: 04/27/1993
Colour Light Signals Post Units Type HS- Foot Mounting
$5.7
NR NR/L2/CTM/012/008 ISSUE 1
Published Date: 03/06/2010
SIG 08: Undertake Corrective and Preventative Maintenance of Mechanical Signals and AWS Equipment
$7.5
NR NR/L2/RMVP/01327 ISSUE 2
Published Date: 12/05/2020
Maintenance Facilities for Rail Vehicles (aka NR/L2/RVE/01327)
$13.2

Best-Selling Products

SN-ISO/IEC ISP 10607-1:1990
Published Date: 03/01/1994
Information technology — International Standardized Profiles AFTnn — File Transfer, Access and Management — Part 1: Specification of ACSE, Presentation and Session Protocols for the use by FTAM