NR NR/L2/ELP/21088/MOD 07 ISSUE 1 PDF

NR NR/L2/ELP/21088/MOD 07 ISSUE 1 PDF

Name:
NR NR/L2/ELP/21088/MOD 07 ISSUE 1 PDF

Published Date:
12/05/2015

Status:
[ Active ]

Description:

General Maintenance Parameters for Overhead Line Electrification Equipment: Mark 3C Maintenance Parameters

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module of NR/L2/ELP/21088 covers:

a) Equipment Design;

b) Equipment Design Variations;

c) Equipment Design Designations;

d) Environmental Conditions;

e) Maximum Pantograph Operational Speeds;

f) Continuous Current Carrying Capacity;

g) Design Staggers and Deviation;

h) Minimum Staggers;

i) Design Heights;

j) Heel Settings;

k) Track Tolerances;

l) Maximum Dropper Spacing;

m) Conductor Particulars;

n) Conductor Tensions;

o) Factor of Safety.


Edition : 1
File Size : 1 file , 78 KB
Number of Pages : 10
Published : 12/05/2015

History


Related products

NR BRS-SM 397
Published Date: 12/22/1972
Facing Point Layout-Mechanical Fitting of BR ELEC. Point Detector at First Drive of Plain Leads with Mechanical F.P. Lock for F.B. & B.H. Track
$5.7
NR RT/E/WI/00103 ISSUE 1
Published Date: 08/01/2004
HW Risk Based Maintenance (aka NR/WI/SIG/00103)
$24.3
NR NR/L3/ELP/29987/MOD06 ISSUE 8
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Planning of Isolations
$13.2
NR NR/L3/TRK/002/D08 ISSUE 1
Published Date: 08/01/2007
Piped Drainage & Catchpit Maintenance
$5.7

Best-Selling Products