NR NR/L3/ELP/29987/MOD06 ISSUE 8 PDF

NR NR/L3/ELP/29987/MOD06 ISSUE 8 PDF

Name:
NR NR/L3/ELP/29987/MOD06 ISSUE 8 PDF

Published Date:
09/03/2022

Status:
[ Active ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Planning of Isolations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-elp-29987-mod06-issue-8_2771466

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

This module states the requirements for the advance planning of isolations for the purpose of carrying out work in order to produce a coherent technically compliant Isolation Planning Form (IPF) for a particular week and route on 25 kV a.c. electrified lines.

It is applicable to Network Rail personnel and to Network Rail’s contractors. It is also applicable in relevant part to Train Operating Companies having locally controlled 25 kV a.c. overhead lines which abut those controlled by Network Rail.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard in full on infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z).

Purpose

This module provides a consistent approach to planning isolations on 25 kV a.c. electrified lines and preparing coherent technically compliant Isolation Planning Forms (IPF).

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC) and Handbook HB16 (GE/RT8000/HB16).


Edition : 8
File Size : 1 file , 230 KB
Number of Pages : 15
Published : 09/03/2022

History

NR NR/L3/ELP/29987/MOD06 ISSUE 8
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Planning of Isolations
13.20 €
NR NR/L3/ELP/29987/MOD06 ISSUE 7
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Planning of Isolations
13.20 €
NR NR/L3/ELP/29987/MOD06 ISSUE 6
Published Date: 09/04/2021
Working on or About 25 kV A.C. Electrified Lines: Planning of Isolations
13.20 €
NR NR/L3/ELP/29987/MOD06 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Planning of Isolations
24.30 €

Related products

NR BRS-SM 208/102 ISSUE C
Published Date: 03/27/1985
Joint Long Jaw for Adjusting Crank
5.70 €
NR NR/CIV/SD/2172-1 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 9.4m Concrete Parapet Beam Right Skew 45º
5.70 €
NR BRS-SM 595 ISSUE A
Published Date: 07/03/1981
Train Operated Points G.A. of Hydraulics Equipment at Willesden for Lightly Worked Lines
5.70 €
NR NR/L3/SCO/204/03 ISSUE 1
Published Date: 12/05/2020
Switches and Crossings Recycling Process: S&C Rail Adjustment Pressing Process
13.20 €

Best-Selling Products

NCSL CALIB
Published Date:
Calibration Laboratory Manager´s Guidebook
NCSL RISP-1
Published Date: 01/01/2017
Josephson Voltage Standard
NCSL RISP-3
Published Date: 08/01/1997
Quantized Hall Resistance
NCSL RISP-4
Published Date: 07/01/1998
Deadweight Pressure Gauges
NCSL RISP-5
Published Date: 01/01/2017
Two-Pressure, Two Temperature Humidity Generator
NCSL RP-10
Published Date: 01/01/2004
Operation of Electric Utility Metrology Lab