NR NR/L2/ELP/27715/MOD 02 ISSUE 2 PDF

NR NR/L2/ELP/27715/MOD 02 ISSUE 2 PDF

Name:
NR NR/L2/ELP/27715/MOD 02 ISSUE 2 PDF

Published Date:
12/02/2023

Status:
[ Active ]

Description:

Overhead Contact System Design Specification: Module 2 Allocation Design Principles

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module specifies the requirements for OCS allocation design. 

This module is applicable to modification of, renewal of, or new railway subsystems that impact on the OCS and, in particular, any work that impacts the integration of the OCS with the corresponding features of other interconnected systems. 

This module is applicable to all OCS Designers. 

Purpose 

The purpose of this module is to specify the Network Rail requirements to meet legislation and to achieve safety, economy and performance when developing the principal features of an Overhead Contact System (OCS), in particular the integration with other interconnected systems. 

This module provides a common strategy to demonstrate compliance and optimise the design of railway subsystems but is not intended to reiterate legislation and governing standards.


Edition : 2
File Size : 1 file , 760 KB
Number of Pages : 25
Published : 12/02/2023

History

NR NR/L2/ELP/27715/MOD 02 ISSUE 2
Published Date: 12/02/2023
Overhead Contact System Design Specification: Module 2 Allocation Design Principles
$18.6
NR NR/L2/ELP/27715/MOD 02 ISSUE 1
Published Date: 03/03/2018
Overhead Contact System Design Specification: Module 2 Allocation Design Principles
$18.6

Related products

NR T60262 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Train dispatch - Shunters Acceptance Plunger. Acc: Relay Interface Location Case Circuit
$5.7
NR X70130 ISSUE 4
Published Date: 04/07/2007
MCB Typical Circuits Barrier Controls For Mechanical Signalling (1)
$5.7
NR T25203 ISSUE 1
Published Date: 12/03/2016
Lineside & On Track Typical Circuits Points - Points - Standard & In-Bearer Clamp Lock Applications (4)
$5.7
NR NR/L3/ELP/27240/NR/DIST C33H ISSUE 2
Published Date: 03/02/2019
Maintenance of 25kV Track-Side Driescher Motor Operated Switch (MOS) and Circuit Main Earth (CME)
$13.2

Best-Selling Products

ABCB
Published Date: 01/01/2022
2022 National Construction Code (NCC), Complete Series (Volumes 1-3)
AG 201-1998 (AMDTS)
Published Date: 01/01/1998
Approval requirements for manual shut-off valves
Free Download
AG 201-1998 AMDTS
Published Date: 03/01/2002
Approval requirements for manual shut-off valves
AG 202-1998 (AMDTS)
Published Date: 01/01/1998
Approval requirements for gas appliance regulators (incorporates Amendments)
Free Download
AG 202-1998 AMDTS
Published Date: 06/01/2003
Approval requirements for gas appliance regulators
AG 203-1998 (AMDTS)
Published Date: 01/01/1998
Approval requirements for gas appliance thermostats
Free Download