NR NR/L2/ELP/27715/MOD 02 ISSUE 2 PDF

NR NR/L2/ELP/27715/MOD 02 ISSUE 2 PDF

Name:
NR NR/L2/ELP/27715/MOD 02 ISSUE 2 PDF

Published Date:
12/02/2023

Status:
[ Active ]

Description:

Overhead Contact System Design Specification: Module 2 Allocation Design Principles

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l2-elp-27715-mod-02-issue-2_2775700

Choose Document Language:
18.60 €
Need Help?
PDF ONLY

This module specifies the requirements for OCS allocation design. 

This module is applicable to modification of, renewal of, or new railway subsystems that impact on the OCS and, in particular, any work that impacts the integration of the OCS with the corresponding features of other interconnected systems. 

This module is applicable to all OCS Designers. 

Purpose 

The purpose of this module is to specify the Network Rail requirements to meet legislation and to achieve safety, economy and performance when developing the principal features of an Overhead Contact System (OCS), in particular the integration with other interconnected systems. 

This module provides a common strategy to demonstrate compliance and optimise the design of railway subsystems but is not intended to reiterate legislation and governing standards.


Edition : 2
File Size : 1 file , 760 KB
Number of Pages : 25
Published : 12/02/2023

History

NR NR/L2/ELP/27715/MOD 02 ISSUE 2
Published Date: 12/02/2023
Overhead Contact System Design Specification: Module 2 Allocation Design Principles
18.60 €
NR NR/L2/ELP/27715/MOD 02 ISSUE 1
Published Date: 03/03/2018
Overhead Contact System Design Specification: Module 2 Allocation Design Principles
18.60 €

Related products

NR T60262 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Train dispatch - Shunters Acceptance Plunger. Acc: Relay Interface Location Case Circuit
5.70 €
NR X70130 ISSUE 4
Published Date: 04/07/2007
MCB Typical Circuits Barrier Controls For Mechanical Signalling (1)
5.70 €
NR T25203 ISSUE 1
Published Date: 12/03/2016
Lineside & On Track Typical Circuits Points - Points - Standard & In-Bearer Clamp Lock Applications (4)
5.70 €
NR NR/L3/ELP/27240/NR/DIST C33H ISSUE 2
Published Date: 03/02/2019
Maintenance of 25kV Track-Side Driescher Motor Operated Switch (MOS) and Circuit Main Earth (CME)
13.20 €

Best-Selling Products

A4A A4A PUBLICATIONS LIBRARY
Published Date: 01/01/2016
A4A Publications Library...Includes various e-business, operations and safety publications
A4A A4A PUBLICATIONS LIBRARY
Published Date: 01/01/2017
A4A Publications Library...Includes various e-business, operations and safety publications
A4A A4A PUBLICATIONS LIBRARY
Published Date: 01/01/2020
A4A Publications Library
3429.00 €
A4A A4A PUBLICATIONS LIBRARY
Published Date: 01/01/2019
A4A Publications Library
A4A CSDD
Published Date: 01/01/2020
Common Support Data Dictionary (CSDD)
191.40 €
A4A CSDD
Published Date: 01/01/2017
Common Support Data Dictionary (CSDD)