NR NR/L2/ELP/27715/MOD 06 ISSUE 2 PDF

NR NR/L2/ELP/27715/MOD 06 ISSUE 2 PDF

Name:
NR NR/L2/ELP/27715/MOD 06 ISSUE 2 PDF

Published Date:
12/02/2023

Status:
[ Active ]

Description:

Overhead Contact System Design Specification: Module 6 Governance of Overhead Contact System Design Ranges

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

The module details requirements for the following features of the OCS basic design ranges:

• management of drawings;

• requirements for new drawings to be added to a range;

• review and acceptance process;

• Interdependency with the product acceptance process and the Interim Statement of Verification (ISV);

• roles and responsibilities;

• process for assurance.

This module is applicable to all OCS Designers.

Purpose

This module specifies the requirements and processes involved in the creation and management of Overhead Contact System (OCS) basic design ranges to meet legislative requirements and to achieve safety, economy and performance when developing the principal features of an OCS.

This module provides a common strategy to demonstrate compliance and optimise the design of railway subsystems, but is not intended to reiterate legislation and governing standards. 


Edition : 2
File Size : 1 file , 180 KB
Number of Pages : 8
Published : 12/02/2023

History

NR NR/L2/ELP/27715/MOD 06 ISSUE 2
Published Date: 12/02/2023
Overhead Contact System Design Specification: Module 6 Governance of Overhead Contact System Design Ranges
$7.5
NR NR/L2/ELP/27715/MOD 06 ISSUE 1
Published Date: 03/03/2018
Overhead Contact System Design Specification: Module 6 Governance of Overhead Contact System Design Ranges
$7.5

Related products

NR NR/L3/CTM/306/02 ISSUE 2
Published Date: 12/02/2023
Skills Assessment Scheme: Assessor Competence
$7.5
NR NR/L2/TRK/001/C01 ISSUE 4
Published Date: 12/05/2009
Inspection and Maintenance of Permanent Way - Geometry and Gauge Clearance
$18.6
NR NR/L3/OPS/045/3.31 ISSUE 3
Published Date: 07/01/2023
National Operating Procedure (NOP) 3.31: Permissive Working
$7.5
NR RT/CE/C/016 ISSUE 1
Published Date: 06/01/2000
Assessment of Strength of Rails with Localised Head Loss in Tunnels
$18.6

Best-Selling Products

ATIS 0100001.2004(S2018)
Published Date: 10/01/2004
User Plane Security Guidelines and Requirements for ETS
$18
ATIS 0100002
Published Date: 07/01/2004
Reliability Aspects of Next Generation Networks
$43.5
ATIS 0100003
Published Date: 11/01/2004
User Plane Priority Levels for IP Networks and Services
$18
ATIS 0100004
Published Date: 01/01/2006
Availability & Restorability Aspects of Emergency Telecommunications Service (ETS)
$33
ATIS 0100005.2006 (S2016)
Published Date: 05/01/2007
Auditory Non-Intrusive Quality Estimation Plus (ANIQUE+): Perceptual Model for Non-Intrusive Estimation of Narrowband Speech Quality
$33
ATIS 0100006
Published Date: 05/01/2006
Service Restoration Priority Levels for IP Networks
$18