NR NR/L3/OPS/045/3.31 ISSUE 3 PDF

NR NR/L3/OPS/045/3.31 ISSUE 3 PDF

Name:
NR NR/L3/OPS/045/3.31 ISSUE 3 PDF

Published Date:
07/01/2023

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 3.31: Permissive Working

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This procedure covers all non-passenger permissive signalled moves and all permissive platform signalled moves including:

• Goods Lines / Loops;

• Reception / Arrival Lines (Network Rail Infrastructure);

• contingency arrangements;

• attaching and detaching to / from passenger trains (including where one portion is Empty Coaching Stock (ECS));

• platform sharing (PP-S);

• terminal stations;

• Permissive Platform (PP);

• Permissive Platform Contingency purposes (PP-C); and

• Permissive Platform Attaching / Detaching movements (PP-A).

This procedure does not cover:

• attaching / detaching to / from ECS trains (shunting with the authority of a ground position signal);

• locomotives either changing ends or being changed; and

• assistance to failed trains.

NOTE: For guidance on permissive working see RIS-0744-CCS.

PURPOSE

This procedure sets out the requirements for signalling two trains when the second is signalled onto a running line which is already occupied.

The procedure:

a) controls the risk so far as reasonably practicable of train collisions when signalled in accordance with the permissive working arrangements;

b) allows permissive working to be conducted in a safe manner and with an assessment of all the factors that might affect a driver’s ability to perform this manoeuvre satisfactorily; and

c) allows for the decision to be made as to whether to continue with the current permissive working arrangements or alternatively as to whether permissive working at that location is no longer required.

During significant service disruption permissive platform workings allow:

a) increased line capacity;

NOTE: e.g. by attaching two trains together.

b) passengers to make alternative travel arrangements;

c) passengers to use the station’s facilities;

d) clearance of heavily delayed trains to be expedited; and

e) reduction in the risk of passengers self-evacuating.


Edition : 3
File Size : 1 file , 560 KB
Number of Pages : 9
Published : 07/01/2023

History

NR NR/L3/OPS/045/3.31 ISSUE 3
Published Date: 07/01/2023
National Operating Procedure (NOP) 3.31: Permissive Working
$7.5
NR NR/L3/OPS/045/3.31 ISSUE 2
Published Date: 09/04/2021
National Operating Procedure (NOP) 3.31: Permissive Working - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$7.5
NR NR/L3/OPS/045/3.31 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.31: Permissive Platform Working
$7.5

Related products

NR BRS-SM 457
Published Date:
4" Centres Ground Frame Mild Steel Bars Details of Drilling
$5.7
NR TI 155 ISSUE 1
Published Date: 02/24/2011
Signal House LED Colour Light Signals - Aspect Module Voltage Tappings
$5.7
NR NR/L3/OCS/044/MS-30 ISSUE 2
Published Date: 06/04/2011
Managed Station Manual: Safety and Induction File
$5.7
NR NR/CIV/SD/108 ISSUE B
Published Date: 09/02/2017
Brick & Masonry Repairs: Stitching Rotational Cracks
$5.7

Best-Selling Products

EEMUA /EI Publication 241
Published Date: 06/01/2019
Guidance on the Presence and Operation of Portable Self Energised Electrical/Electronic Devices in Potentially Explosive Atmospheres (Gas and Dust)
$63
EEMUA Publication 133
Published Date: 05/01/2011
Specification for Underground Armoured Cable Protected against Solvent Penetration and Corrosive Attack, Revised 2015
$25.146
EEMUA Publication 138
Published Date: 01/01/2010
Design and Installation of On-Line Analyze Systems, Revised 2015
$83.439
EEMUA Publication 140
Published Date: 11/01/2014
Noise Procedure Specification, Revised 2015
$32.004
EEMUA Publication 141
Published Date: 11/01/2014
Guide to the Use of Noise Procedure Specification, Revised 2015
$30.48
EEMUA Publication 149
Published Date: 01/01/1997
Code of Practice for the Identification and Checking of Materials of Construction in Pressure Systems in Process Plants, Revised 2015
$34.671