Description:

Engineering Management for Projects (aka NR/SP/BUS/02009)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
SUPERSEDED BY NR/L2/RSE/02009

The scope of this standard applies to all Infrastructure Investment projects that change or renew Network Rail assets. It applies whether the design for a project is undertaken by Network Rail staff or by contractors contracted to Network Rail or contractors contracted to another party under an agreement with Network Rail.

This standard is not applicable to Network Rail Infrastructure Maintenance when they deliver projects (or elements of projects) on behalf of Infrastructure Investment where their involvement is limited to undertaking maintenance processes in accordance with Infrastructure Maintenance standards. In all other cases where Infrastructure Maintenance deliver projects (or elements of projects) on behalf of Infrastructure Investment this standard applies and Infrastructure Maintenance will be treated as a ‘contractor' as defined within this standard.

This standard applies to all phases of a project as applicable, including, but not limited to:

a) feasibility studies;

b) design;

c) construction;

d) testing and commissioning;

e) de-commissioning and demolition.

This standard applies to projects which protect Network Rail's asset when a party other than Network Rail carries out work on, over or under Network Rail property.

The requirements defined within this standard are specific to this standard only; additional accountabilities and responsibilities are allocated in other Railway Group and Network Rail Standards and Legislation.

The requirements defined within this standard detail responsibilities aligned to elements of the CDM Regulations. NR/L2/INI/CP0047 ‘Application of the Construction, Design and Management Regulations to Infrastructure Investment Projects' defines the full responsibilities to achieve compliance with the CDM Regulations.

Purpose

The purpose of this standard is to describe the processes and roles and responsibilities of staff responsible for the management of the technical and engineering requirements of projects for and on behalf of Network Rail Infrastructure Investment.


Edition : 3
File Size : 1 file , 550 KB
Number of Pages : 48
Published : 12/01/2008

History

NR NR/L2/RSE/02009 ISSUE 8
Published Date: 03/04/2023
Engineering Management for Projects
$24.3
NR NR/L2/RSE/02009 ISSUE 7
Published Date: 03/06/2021
Engineering Management for Projects (aka NR/L2/INI/02009)
$24.3
NR NR/L2/INI/02009 ISSUE 6
Published Date: 09/05/2015
Engineering Management for Projects
$24.3
NR NR/L2/INI/02009 ISSUE 5
Published Date: 06/04/2011
Engineering Management for Projects (aka NR/SP/BUS/02009)
$18.6
NR NR/L2/INI/02009 ISSUE 4
Published Date: 12/05/2009
Engineering Management for Projects (aka NR/SP/BUS/02009)
$24.3
NR NR/L2/INI/02009 ISSUE 3
Published Date: 12/01/2008
Engineering Management for Projects (aka NR/SP/BUS/02009)
$18.6
NR RT/E/P/02009 ISSUE 2
Published Date: 10/01/2001
Engineering Management for Projects (aka NR/SP/BUS/02009)
$18.6

Related products

NR NB 033 ISSUE 1
Published Date: 10/01/2004
TI21/Aster Hybrid: Interface Connection
$5.7
NR TI 065 ISSUE 1
Published Date: 05/01/2007
Install New or Replacement SSI LDT Filter
$5.7
NR NR/L3/ELP/SAI25 ISSUE 3
Published Date: 06/01/2024
Working On or About Overhead Line Equipment (SAI) - (for Early Deployment in North West and Anglia Routes)
$18.6
NR E10000/21/1 ISSUE A
Published Date: 06/24/1963
Shunters Acceptance Circuitry
$5.7

Best-Selling Products

UIC 895
Published Date: 01/07/1976
Technical Specification for the Supply of Insulated Electric Cables for Railway Vehicles