NR NR/L2/RSE/02009 ISSUE 8 PDF

NR NR/L2/RSE/02009 ISSUE 8 PDF

Name:
NR NR/L2/RSE/02009 ISSUE 8 PDF

Published Date:
03/04/2023

Status:
[ Active ]

Description:

Engineering Management for Projects

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

Applicability

This standard applies to the following key areas:

a) key engineering roles including accountabilities and responsibilities; 

b) relationship and links to key standards and legislation;

c) engineering interface management arrangements;

d) appointment processes for key engineering roles; 

e) engineering and construction management plans;

f) managing non-compliances to standards;

g) technical approval and technical acceptance processes; 

h) production of engineering compliance certificates; 

i) competence assessment requirements; and

j) management and review of engineering deliverables. 

It applies to all organisations working on projects; including Network Rail Alliances, Joint Ventures and Capital Delivery and maintenance teams responsible for the design, delivery and assurance of the engineering requirements of Projects, Programmes and Portfolios impacting Network Rail infrastructure, that: 

• change, renew, enhance or remove the operational railway; 

• are defined in NR/L1/CIV/094 as Third Party works, unless an agreed and documented arrangement is in place with Network Rail; 

• are defined in NR/L1/CIV/094 as Outside Party works that require incidental changes to the Network Rail Infrastructure, unless an agreed and documented arrangement is in place with Network Rail. 

NOTE: More information on Project, Programme and Portfolio Management can be found in NR/L1/INI/P3M/100 and relevant level 2 supporting standards NR/L2/INI/P3M/101 and NR/L2/INI/P3M/102.

Exclusions 

The requirements contained in this standard do not apply: 

a) where the work is managed and undertaken by a Network Rail Region/Routeand the complexity and scale of the work are covered entirely under the controls in NR/L3/MTC/RCS0216 – Risk Control Manual;

b) to Outside Party work where there is no potential to impact Network Rail infrastructure or operations; or 

c) early stage development of a Programme, specified in NR/L2/INI/P3M/102 as stage A, Concept Development. 

Purpose 

This standard aligns engineering management practices with elements of legislative instruments, including the Construction (Design and Management) Regulations 2015, Common Safety Method for Risk Evaluation and Assessment Regulation (EU) and The Railways (Interoperability) Regulations 2011, where work is undertaken on the Network Rail Infrastructure. 

The benefit of the standard is that it provides clear and consistent engineering management requirements for specific: 

• accountabilities and responsibilities; 

• competence requirements; and 

• processes. 

It provides a framework of processes and requirements that are appropriate for the scope and complexity of the project, programme or portfolio being managed. 

Adherence to this standard will help increase the successful delivery of Network Rail’s Project Portfolio and reduce associated reputational, financial and safety risks. 


Edition : 8
File Size : 1 file , 10 MB
Number of Pages : 53
Published : 03/04/2023

History

NR NR/L2/RSE/02009 ISSUE 8
Published Date: 03/04/2023
Engineering Management for Projects
$24.3
NR NR/L2/RSE/02009 ISSUE 7
Published Date: 03/06/2021
Engineering Management for Projects (aka NR/L2/INI/02009)
$24.3
NR NR/L2/INI/02009 ISSUE 6
Published Date: 09/05/2015
Engineering Management for Projects
$24.3
NR NR/L2/INI/02009 ISSUE 5
Published Date: 06/04/2011
Engineering Management for Projects (aka NR/SP/BUS/02009)
$18.6
NR NR/L2/INI/02009 ISSUE 4
Published Date: 12/05/2009
Engineering Management for Projects (aka NR/SP/BUS/02009)
$24.3
NR NR/L2/INI/02009 ISSUE 3
Published Date: 12/01/2008
Engineering Management for Projects (aka NR/SP/BUS/02009)
$18.6
NR RT/E/P/02009 ISSUE 2
Published Date: 10/01/2001
Engineering Management for Projects (aka NR/SP/BUS/02009)
$18.6

Related products

NR NR/L3/ELP/27240/NR/DIST C10J ISSUE 3
Published Date: 03/01/2017
Routine Inspection and Secondary Injection Testing of DZA and XFE Protection Relay
$13.2
NR E10000/20/1 ISSUE D
Published Date: 03/07/1980
Registration of Signalling Numbers
$5.7
NR NR/SMS/PART/T ISSUE 9
Published Date: 06/04/2022
Signal Maintenance Specifications (SMS): PART T
$18.6
NR E10000/11/20 ISSUE D
Published Date: 08/27/1993
Track Circuits - Use of Treadles eg for Level Crossings
$5.7

Best-Selling Products

TMS 1002-08
Published Date: 01/01/2008
A Transition Guide from the 2005 to the 2008 MSJC
$6
TMS 1222-17
Published Date: 2018
Masonry Basics, 2nd Edition
$10.5
TMS 1409-18
Published Date: 2018
Masonry Structures: Behavior and Design, 4th Edition
$54
TMS 1700-17
Published Date: 2017
Guide for Condition Assessment of Masonry Facades, 2017
$6
TMS 216-07
Published Date: 06/01/2007
Determining Fire Resistance - Concrete and Masonry (ACI 216.1-07 / TMS-0216-07)
$15.6